1 / 12

SAGE Suite Subcontract Module Project Automating Subcontract F&A Costs Recovery

SAGE Suite Subcontract Module Project Automating Subcontract F&A Costs Recovery. Jason Myers – Business Systems Analyst Office of Research Information Services (ORIS). Project History.

avery
Download Presentation

SAGE Suite Subcontract Module Project Automating Subcontract F&A Costs Recovery

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAGE Suite Subcontract Module ProjectAutomating Subcontract F&A Costs Recovery Jason Myers – Business Systems Analyst Office of Research Information Services (ORIS)

  2. Project History • SAGE Suite Subcontract Module project - Automating Subcontract F&A Cost Recovery - is the final stage of a Financial Management (FM) funding project initiated October 2004. • Purpose of the FM project was to enhance the calculation and posting of indirect costs on grants and contracts using existing in-house systems. Enhancements include: • a) Automate charging indirect costs to all subcontract expenditures • b) Add additional indirect costs bases to the existing list and processes • c) Correct encumbrance liquidation processes • Once SAGE Suite Subcontract Module project is complete, the FM project will be considered complete and closed

  3. Project Overview • Original SAGE Suite Subcontract Project Module project scope included enhancing the SPAERC/SERA and FAS systems to automate subcontract F&A costs recovery • Scope changes were approved to include SPAERC/SERA technical improvements. The resulting project has been phased into two releases: • Subcontracts Phase I: SPAERC and SERA refactored code, bug fixes and related enhancements. • Subcontracts Phase II: Full release of subcontracts functionality as described in the original scope.

  4. July SAGE ReleaseSubcontracts Phase I – System Changes System Changes • Re-work (refactor) of the system’s code to improve system maintainability and set the stage for Subcontracts Phase II • Implementation of 10 enhancements and 15 bug fixes • Enhancements and bug fixes will provide benefits to campus, OSP, and GCA prior to the full subcontract release.

  5. July SAGE ReleaseSubcontracts Phase I – OSP and GCA Benefits Benefits to OSP and GCA • Improved transparency of data with the addition of a Subcontracts Review page that is viewable by OSP and GCA staff • Enhancements to PDF view of eGC1 to ease navigation of eGC1 data • Tighter coupling of SPAERC Funding Actions and Subcontracts; improving transparency of prime and sub award data between OSP and GCA teams • System flag to indicate ARRA funded subcontracts to improve data and reporting • Enhanced search enables ability to identify SPAERC subcontracts by sponsor

  6. July SAGE ReleaseSubcontracts Phase I – Campus Benefits Benefits to Campus Users • FA/PAC • Created ability to change or update email recipients of the funding action (FA) and post award change (PAC) notifications. This can be useful when GCA knows of a change in email address or administrative contacts; the email recipients can be adjusted appropriately • eGC1 • Added bookmarks to all sections of the PDF so you can navigate more easily between different parts of the eGC1. This is particularly beneficial when you use screen reading software.

  7. September SAGE ReleaseSubcontracts Phase II – System Features GOAL: Improve subcontract budget accounting by automating subcontract F&A cost recovery • Automated calculation of F&A Subcontract expenditures in FAS • Ensure subcontract PO Requisition Number and Budget Number entered in SPAERC match the numbers entered in the Purchasing and Accounts Payable System (PAS) through systematic validation • Enable recording and tracking of subcontract F&A data in SPAERC • Synchronize subcontract F&A data stored in SPAERC with data in Financial Accounting System (FAS) on a daily basis

  8. September SAGE ReleaseSubcontracts Phase II – OSP and GCA Benefits Benefits to OSP and GCA • Automation of subcontract F&A expenditures will remove the currently inefficient and timely manual process; resulting in a time and money savings for GCA • Ability to enter F&A data and add subcontract documentation will improve transparency of information between OSP and GCA

  9. September SAGE ReleaseSubcontracts Phase II – Campus Benefits Benefits to Campus Users • Automation of subcontract F&A expenditures will ensure that you have access to timely and accurate subcontract F&A expenditure data • Sets the stage for a SAGE view for Funding Actions, Post Award Changes and Subcontracts

  10. SAGE SuiteLearning Opportunities Patti McClure – Educational Outreach Specialist Office of Research Information Services

  11. Sub-Contracts Training • Currently assessing Training Requirements for OSP and GCA • Undergoing User Acceptance Testing to determine training requirements • Update on any campus training will be provided at August MRAM

  12. Budget Training Opportunities Learn to use new budget features • Two Drop-in Budget Sessions on June 17th • Location: Tower Learning Lab 154 • First Session: 2:00-3:30 p.m. • Second Session: 3:30–5:00 p.m. Register at www.sage.washington.edu Watch for new video tutorials on the ORIS Learning Page! Now featuring: Navigating access to the Approval Graph. Contact us: orislearn@uw.edu