40 likes | 116 Views
Start Up with Electrons. Preliminary Schedule. Tasks. Polarity Check Transfer Line Store Beam BBA ORM Feedbacks Aperture, Acceptance Filling Schemes and Ion Cloud Studies. Schedule. Schedule.
E N D
Start Up with Electrons Preliminary Schedule
Tasks • Polarity Check • Transfer Line • Store Beam • BBA • ORM • Feedbacks • Aperture, Acceptance • Filling Schemes and Ion Cloud Studies