Cost. Total cost is up to $8,645,000 $ 500,000 from Capital Reserve Fund $8.145 million bond for the balance. . Cost Breakdown. Declining Debt Level. Two Bonds Currently Outstanding 1995: $3.972 Million with Last Payment in 2014 Current Annual Net Debt Service of $226,000
E N D
Cost • Total cost is up to $8,645,000 • $500,000 from Capital Reserve Fund • $8.145 million bond for the balance.
Declining Debt Level Two Bonds Currently Outstanding 1995: $3.972 Million with Last Payment in 2014 Current Annual Net Debt Service of $226,000 2003: $9.925 Million with Last Payment in 2017 Current Annual Net Debt Service of $543,456 Total Annual Net Debt Service $769,456 $8.165 Million in New Debt First Year Net Debt Service (2015/16) of $156,000 Subsequent Annual Net Debt Service $490,000
Tax ImpactAnnual tax over 15-year life of bond for average assessed house
Hillside Elementary • Roof Replacement on the K-2 wing of the building • 36 Univents to improve air quality and heating in classrooms • Classroom and Fire Doors to meet current safety standards • Floors of the All Purpose Room (large gym) and the lower wing • Exterior Masonry – repointing of brick work • Electrical Upgrade • Ceiling and Wall finishes
Farragut Middle School • Roof Replacement on the Middle School Auditorium • Exterior Masonry – repointing of brick work and parapets • Electrical Upgrade • Boiler Burner – Replacement of 50-year old equipment
Hastings High School • Roof Replacement on the Cochran Gym • Renovation of the High School Auditorium including Seating, Lighting and Sound Systems, Flooring, Curtains, Rigging, and Stage Resurfacing • Interior Ceiling and Wall finishes
Reynolds Field • Install a Regulation 400-meter track • Install a Geo-turf synthetic field • Install a sidewalk on Chauncey Lane • Replace bleachers in similar style • Add 15-foot lights around track – NO stadium lighting • Refinish all tennis courts (one being relocated) • Relocate playground to grassy area south of tennis courts