1 / 3

WCM-based Bunch Charge Monitoring

WCM-based Bunch Charge Monitoring. A. Kalinin EMMA tasks, experiments, and procedures 23 August 2012. From 19 April 2012: The WCM/Kicker cables are adjusted in length:. IL WCM (beam propagation time to K1 , =6ns) + L (to emmascope3) this cable was faulty! to IN4

awena
Download Presentation

WCM-based Bunch Charge Monitoring

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WCM-based Bunch Charge Monitoring A. Kalinin EMMA tasks, experiments, and procedures 23 August 2012

  2. From 19 April 2012: The WCM/Kicker cables are adjusted in length: IL WCM (beam propagation time to K1, =6ns) + L (to emmascope3) this cable was faulty! to IN4 Injection: splitter emmascope1 L K1 to IN1 L K2 toIN2 L1 ATT S toIN3 Extraction: IN4 L K1 to IN1trigger from IN4L K2 to IN2 L2 S toIN3

  3. Upper: BPM-based Bunch Charge Monitoring (IL and Ring only) • Lower: WCM-based Bunch Charge Monitoring (including the extracted bunch) • For a train ~100 bunches, calibrate against IL FC. • Use!

More Related