150 likes | 446 Views
Chapter Seven. Push and Pull Production Control Systems. Schematic of the Productive System. Fig. 7-1. The Three Major Control Phases of the Productive System. Fig. 7-2. Typical Product Structure Diagram. Fig. 7-3. Trumpet and Subassemblies. Fig. 7-4.
E N D
Chapter Seven Push and Pull Production Control Systems
Schematic of the Productive System Fig. 7-1
The Three Major Control Phases of the Productive System Fig. 7-2
Typical Product Structure Diagram Fig. 7-3
Trumpet and Subassemblies Fig. 7-4
Product Structure Diagram for ICU2 Computer (for Problem 4) Fig. 7-6
Kanban Information SystemVersus Centralized Information System Fig. 7-9
River/Inventory Analogy Illustrating the Advantages of Just-in-Time Fig. 7-10
CalcIt Model IT53Scientific Calculator (Problem 41) Fig. 7-11
Network Representation forLot Scheduline (Example 7A-1) Fig. 7A-1