50 likes | 157 Views
Toroid Status. Ben Freemire HPRF Wednesday Meeting 2/9/11. Pulser Diagram. R1 = 1 k Ω R2 = 1 M Ω R3 = 50 Ω C1 = 0.001 µF V1 = 90.00 V. 1 M Ω Scope Termination. 50 Ω Scope Termination. 51 Ω 510 Ω 1 k Ω. 51 Ω 510 Ω 1 k Ω. Summary. 1 M Ω Scope Termination, Top and Left.
E N D
Toroid Status Ben Freemire HPRF Wednesday Meeting 2/9/11
Pulser Diagram • R1 = 1 kΩ • R2 = 1 MΩ • R3 = 50 Ω • C1 = 0.001 µF • V1 = 90.00 V B. Freemire HPRF Wednesday Meeting
1 MΩ Scope Termination 50 Ω Scope Termination 51 Ω 510 Ω 1 kΩ 51 Ω 510 Ω 1 kΩ B. Freemire HPRF Wednesday Meeting
Summary 1 MΩ Scope Termination, Top and Left 50 Ω Scope Termination, Bottom and Right B. Freemire HPRF Wednesday Meeting