Thursday - Friday. 07 :00 – Late Access Thanks again to CSA and RP Access system maintenance (patrol required), BI, EPC, cryo nQPS patch in four sectors ( S12, S23, S34, S45) deployment and powering tests for validation Cryo de-icing in point 8 Started 04:00 Thursday

azia
Download Presentation

Thursday - Friday

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thursday - Friday • 07:00 – Late Access • Thanks again to CSA and RP • Access system maintenance (patrol required), BI, EPC, cryo • nQPSpatch in four sectors (S12, S23, S34, S45) deployment and powering tests for validation • Cryode-icing in point 8 • Started 04:00 Thursday • End ~11:00 Friday • 01:44 Machine closed • start precycle of available sectors • RQD/F in sector 12 were tripping during the "COMBO" cycle because the reference magnets are "slightly" mixed up..... LHC status

  2. nQPS • Summary of the modifications:1) Update of DQAMGs software for 4 sectors (12, 23, 56 and 67). This includes change of threshold to 800mV. The new parameters were verified by the QPS team • Behaves as expected • 2) Change of the delay of the extraction switches in sector 34 by 100ms (in total, 8 cards were modified) • Not sufficient LHC status

  3. Schedule LHC status