1 / 3

PATD / ICTS / Test Std. / IG control no.

Quality Bulletin . Horizontal deployment. Running model. New model. Re-FPA. New part approval. Prepared CKD App. Model. S/No. Product. Claim section. Claim date. Date of imp. REF. All Models. Field. 24-08-2013. 24-08-2013. Quality issue. Cause. Count measure.

azizi
Download Presentation

PATD / ICTS / Test Std. / IG control no.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quality Bulletin Horizontal deployment Running model New model Re-FPA New part approval Prepared CKD App Model S/No. Product Claim section Claim date Date of imp REF All Models Field 24-08-2013 24-08-2013 Quality issue Cause Count measure • Water Leakage from Drain Elbow. Analysis Why? Water leakage due to elbow right angle. Why? Improper fitment of drain pan and elbow in liner. Temp countermeasure : Elbow design modification done to angular shape (120 Degree angle). Permanent countermeasure : Elbow design modification done to angular shape (120 Degree angle). Before Improved References 1. Drain elbow design was at 90 degree • Shape design changed from right angle to angular (120 degree) PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision )

  2. Quality Bulletin Horizontal deployment Running model New model Re-FPA New part approval Prepared CKD App Model S/No. Product Claim section Claim date Date of imp REF All Models Field 24-08-2013 24-08-2013 Quality issue Cause Count measure • Water Leakage from Drain pan. Analysis Why? Water leakage due to elbow right angle. Why? Improper fitment of elbow and drain pan in liner. Temp countermeasure : Drain Pan design modification done for Knob from straight to angular position as per drain elbow.. Permanent countermeasure : 1. Drain pan design modification done Before Improved References 1. Drain elbow design was at 90 degree Drain Pan design modification done for Knob from straight to angular position as per drain elbow.. PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision )

  3. Quality Bulletin Horizontal deployment Running model New model Re-FPA New part approval Prepared CKD App Model S/No. Product Claim section Claim date Date of imp REF All Models Field 24-08-2013 24-08-2013 Quality issue Cause Count measure • Water Leakage from Drain Elbow. Analysis Why? Water leakage due to elbow right angle. Why? Improper fitment of elbow and drain pan in liner. Temp countermeasure : Drain Tube design changed from PVC to LDPE. Permanent countermeasure : Drain Tube design changed from PVC to LDPE. Before Improved References • More flexible pipe PATD / ICTS / Test Std. / IG control no. ECN No. JIR control no. Others ( Refer OQC/ELT Revision )

More Related