1 / 3

Clarification on Specified Emergency Power (1) Status Proposal

Clarification on Specified Emergency Power (1) Status Proposal Steady State Consumption as given in RDR Table is 1.4 MW Inrush Current of Users must be covered implies a Factor up to 3 Emergency Supply System Design and Costing allows for 5 to 10 MW

azriel
Download Presentation

Clarification on Specified Emergency Power (1) Status Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clarification on Specified Emergency Power (1) • Status Proposal • Steady State Consumption as given in RDR Table is 1.4 MW • Inrush Current of Users must be covered implies • a Factor up to 3 • Emergency Supply System Design and Costing allows for 5 to 10 MW • System Design mainly based on ability to supply over • several km. • RDR Table could be corrected to show Value including inrush Capability : about 4 MVA • To be compared to 5 MVA for LHC at CERN GDE Meeting, Beijing, 4-7 February 2007

  2. Clarification on Specified Emergency Power (2) • List of Main Users (Non Exhaustive) • Emergency Ventilation • Emergency Lighting • Emergency Pumps (Drainage – Firefighting) • Lifts • Alarms and Signaling Systems • Access Control Systems • Supply of Battery back up Systems • etc … GDE Meeting, Beijing, 4-7 February 2007

  3. GDE Meeting, Beijing, 4-7 February 2007

More Related