April, 2003
CHALLENGES ASSOCIATED WITH HORIZONTAL DIRECTIONAL DRILLING AND PIPING INSTALLATION UNDER A MAJOR HIGHWAY FOR THE REMEDIATION OF A PETROLEUM PLUME By: Michael Heffron, P.G., Tetra Tech FW, Inc. April, 2003. Site Background.
520 views • 39 slides