1 / 21

Berbagi Pengalaman Berkarya di Perusahaan Penghasil LNG

Berbagi Pengalaman Berkarya di Perusahaan Penghasil LNG. Helfia Nil Chalis Alumnus Teknologi Kimia ITB Angkatan 1977 Bandung 2014. www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com. Perkenalan. Plaju – Menikah – 2 Anak ( Lk , Pr ) Pendidikan :

baakir
Download Presentation

Berbagi Pengalaman Berkarya di Perusahaan Penghasil LNG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BerbagiPengalamanBerkarya di Perusahaan Penghasil LNG Helfia Nil Chalis Alumnus Teknologi Kimia ITB Angkatan 1977 Bandung 2014 www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  2. Perkenalan • Plaju – Menikah – 2 Anak (Lk, Pr) • Pendidikan: • TK YPNP 1963 – SD YPNP 1965 – SMP Muh III 1971, SMAN II Bogor 1974 • Mahasiswa: • Matrikulasi M10 – TPB T5 – TK 1977 • PengalamanPertamaKerja: • PT Duma Na Napudan PT CurahNiagaInternasional, Jakarta 1983 • Pengalaman di Industri LNG: • LNG Badak, LNG Tangguh 1984sampaisekarang • Pensiun: 2016 www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  3. PokokBahasan • Project Engineer Pabrik PTA Petrowidada • MerintisKarir di LNG BadakBontang, Kaltim (22 Tahun) • Membangun Tim Operasi LNG Tangguh (7 Tahun) www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  4. Project Engineer PTA Plant • Perusahaan Perorangan Soy MartuaPardede • Si butadansilumpuh di Jakarta • Survey produktivitaskeDinasPerindustrian • Belajarbahasabisnislewatmesin TELEX • Berkunjungkekantorpusat DAEWOO di Seoul • Survey pabrikpengolahankapuralam di Korea • Site preparation bersamatim DAEWOO di Gresik • Berhentikarenagengsi • MenjadiPengangguran • 100 Lamaran + Tirakat www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  5. PelajaranPenting • Usaha + Kepandaian + KetrampilanSukses • Keberhasilan / SuksesUPT • LebihSeriusMemohon“RahmatTuhan” • SelaluBerbaikSangkaAtas “KeputusanTuhan” “RahmatTuhan” www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  6. MerintisKarir di LNG BadakBontang (1) • Process Engineer • 3 bulanhanyamembaca operating manual • Tugasmengupgrade Nitrogen Plant • Group Head Utilities • Tugas Debottlenecking Project di Houston • Lead HAZOP Study Utilities + Storage Loading www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  7. MerintisKarir di LNG BadakBontang (2) • Train-E Day Superintendent • Shutdown Coordinator • Kebocoran LNG dari Train-F Tie-in • Train-F Start-up Coordinator • Rekor Start-up: 5,5 hari Gas-in to LNG drop • Gastech Conference, IPA Conference • Shift Superintendent • 7 Train, 18 Boiler, 13 Power Gen • 21 Shift Supervisor, 74 Operator • Emergency Response Drills www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  8. MerintisKarir di LNG BadakBontang (3) • Train-E/F/G/H Section Head • Quality Improvement Program • Safe & On Schedule Turn-around • Tim QRA ESD Valve Train-F di DNV Paris • Train-H Start-up Manager • Production Planning Section Head • IsuKontaminasi Perlite • PuncakKesibukanPengapalan LNG Badak > 400 Kargo • Produksi Gas dariLapanganMenurun • Deputy Operation Manager • PerbaikanTangki LNG 24D-6 www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  9. Membangun Tim Operasi LNG Tangguh (1) • Organizational Capability • Operator BaruAsli Papua • PengawasBerpengalamanTimteng + Bontang + Cilegon • Training di LNG Badak + AkamigasCepu + LAPI ITB • Training Simulator • Vendor Training, Computer Based Training • UjiKompetensi • MengenalPeralatan • Orientasike LNG Badak • TerlibatdalamKonstruksidan Commissioning • KunjungankePabrikPembuat www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  10. Operation Technicians Training in Badak LNG Plant Batch 3 (24 personnel) In progress Operation Technicians Training in Badak LNG Plant, Batches 1 & 2 (57 personnel) Graduated in May 2007 www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  11. Membangun Tim Operasi LNG Tangguh (2) • MenyusunOrganisasi • MengacuOrganisasi LNG Badak • Pola On/Off 28 – 28 dan 12 Jam Kerja per Hari • MenyusunProsedurOperasi • Mengacu Manual OperasidanDokumen Vendor • MencariPembandingdariPabrik LNG + Petrokimia • MengatasiKeterbatasanPersonil • Bantuan Operator DCS dari LNG Badak • Menyusun Budget danKontrak • Mengadakan Workshop PenyusunanStrategiKontrak • MendapatkanPersetujuanBPMIGAS www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  12. FIRST DROP 14 JUNI 2009 JAM 22.30 www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  13. First Cargo: Tangguh Foja www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  14. Membangun Tim Operasi LNG Tangguh (3) • TantanganOperasiTahunPertama • MengatasiBanyakMasalahDisain • Lebihdari 25 ModifikasidanPerbaikanBesar • MensinergikanPersonil BP – Non BP • MensinergikanPersonil Non Oil & Gas – Oil & Gas • MenyusundanMensosialisasikan “Visi LNG Tangguh” • MenyusunKesepakatan “How We Operate” • MembinaBudayaKerjaBerfokus Safety (Personal + Proses) MOTTO MELAKUKAN HAL YANG TEPAT DENGAN BENAR SEJAK PERTAMA KALI DAN SETIAP KALINYA www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  15. HAR Shielding AFC Motor Replacements DGS Temporary & Fix Repairs C3 PRV Re-setting (TAR) Dry Gas Seal (DGS) Problem BOG Repair Choke Replacement Program (TAR) AGI Repair Hot Air Recirculation Problem Tank-2 Repair Refrigeration C3R Acid Gas Incinerator (AGI) Refractory problem BOG DGS Problem MR HPMR Repair HPMR Big O-Ring Failure Tank-2 Roof Rupture Choke Oversize Utilities Power Cooling Water VRA Subsea Pipeline Leak Waste Water Treatment AGRU Low Performance due to HC Carry-over No C2R Production Expanders Manufacturer Defect PWT Under Design Dryer Bed Failures HC Liquid Carry-Over Pipeline Repair Scrub Column Modification (TAR) Vortex Breaker Modification (TAR) Build Temporary & New Permanent PWT Plant Turbo Expander Repair Dryer Repair & Hg Catalyst replacement D-1004 Modification (TAR) TantanganTahunPertamaOperasi – SebuahPerjalananPantangMenyerahMencapaiKapasitas “Name Plate” BOG Comp. Fuel C3R MR Fuel Gas Pre-treatment(H2O & Hg Removals) On-shore Receiving Facilities (ORF) LNG Storage Tanks Gas Sweetening (AGRU) Subsea Pipeline LNG Loading Liquefaction • MenghadapiBanyakMasalahDisain • Melaksanakan 25++ ModifikasidanPerbaikanBesar • Mensinergikan non-BP dannon Oil & Gas • Pengadaan Material • MendapatkanOperasi yang Stabil www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  16. Melanjutkan Start-up denganTemporary Waste Water Treatment Plant Mengapa? • High COD, Phenol dansenyawahidrokarbonaromatikterlarutdalam air yang ada di Produced Water Lingkup • Dissolved Air Flotation (DAF) • Bio-reactor for COD Treatment • Sand & Activated Carbon Filters • Cetco Unit for Oil removal Sekarang • Sudahdibangun Waste Water Treatment Plant BarudanBerhasilMengatasiMasalah COD, Phenol, dll. www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  17. PerbaikanAtapTangki No. 2 MILESTONES • BocorDitemukan: 8thSept 09 • Kosongkandgn Cargo: 18thDec 09 • N2 Purged: 4thFeb 10 • Mech. Permanent Repair: 1st May 10 • Tank Back in Service: 29th Jun 10 • Lama Perbaikan 9 months PELAKSANAAN • Tim GabunganProyek& Operasi • TanpaKecelakaan • MengelolaInventori, Produksi,danPengapalandengan Baik SelamaBeroperationdenganSatuTangki • TanpaadaDampakProduksi www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  18. PerjalananMencapaiKapasitas “Name Plate” www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  19. CatatanSejarahOperasi LNG Tangguh (2) 2009 • Tetesan LNG Perdana Train-1 – 13 Juni • Pengapalan LNG Perdana FOJA – 30 Juni • Tangki LNG No. 2 bocor – 8 September • Tetesan LNG Perdana Train-2 – 3 Oktober • Gempadisusul Total Black-out – 25 Oktober • Control of Work diterapkanpenuh – Desember • 2010 • Organisasi Transisi 1 – April • Organisasi Transisi 2 – Desember • HC carryover AGRU Train-1/2 • 2011 • TAR-1 berhasil diselesaikan – April • TAR-2 berhasil diselesaikan – Juni • Train-1/2 at name plate – September • WWTP in service – Januari www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  20. TantanganOperasi LNG Tangguh 2012 – 2013 • Kebakaran PR1 DLN Skid 2012 • Perbaikanbisadiselesaikandalamwaktu 1 bulan (Nov 2012) • PipaMuatTangki LNG No. 1 Mengalami “Surging” 12 Agustus 2012 • Perbaikanmembutuhkanwaktu 1 tahun • Pipabarusiapdigunakan November 2013 • Operasikembali normal Desember 2013 • PerubahanOrganisasi • Menjadi “Area Based Organization” • Program “Ownership” di Department Produksi • Lebihproaktifdalam program Process Safety www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

  21. Penutup • Pelatihan Yang TerukurdanTerarahMutlakuntukMeningkatkanKeahlian (UPT) • Sukses = UPT + RahmatTuhan • MeraihRahmatTuhanPerluKesungguhan • LuruskanNiat, PenuhKesungguhan, Ikhlas • HarusSiapuntukNaikdanSiapJugauntukTurun • SiapkanPenggantiAndaSejakDini • PersiapkanPurna Bakti • Ringan, Bermanfaat, Self Sustain www.Helfia.net , www.HelfiaGoOnline.com , www.HelfiaStore.com

More Related