Results on recent technology developments at ATF

Results on recent technology developments at ATF. - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion , Crete, Greece, 2011/Oct/5. Beam Position Monitors. 2/27. DR BPM Upgrade for 2 pm emittance.

baby
Download Presentation

Results on recent technology developments at ATF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5

  2. Beam Position Monitors 2/27

  3. DR BPM Upgrade for 2 pm emittance • The original read-out system designed for the single path position measurement has a 10 mm resolution. • Upgraded BPM readout system: FNAL • Utilize analog down-conversion and digital signal processing techniques • automatic gain-correction • New functions for optics analysis • Broadband turn-by-turn mode (< 10 µm resolution) • Injection 1,000 turns • Extraction 64 turns • Narrowband mode with high resolution (~ 100 nm range) • 160 ms, 500,000 turns after injection • Further investigation for the system completion is continued. New Downmix & Calibration LO & CAN-bus Distribution New Timing Module & Custom Digitizers 3/27

  4. KNU / PAL / KEK / RHUL / SLAC ATF2 Cavity BPM system C-band BPM system BPM cavity: 34 units Reference cavity: 4 units Target resolution: 100 nm Aperture: f20 mm S-band BPM system BPM cavity: 4 units Ref. cavity: 1 unit Target : 100 nm Aperture: f40 mm IP BPM system (BPM + Ref) Cavity 1 unit Target : 2 nm Aperture: 6 mm(V) 4/27

  5. C-band BPM • 20 dB attenuation, most of C-band BPMs to widen the dynamic range • Resolutions: • with 20dB att. ~ 200 nm • w/o 20dB att. ~ 50 nm (well centered beam w/o saturation  27 nm) Present Status of the ATF2 Cavity BPMs By S. Boogert (RHUL) S-band BPM Resolution ~ 1 mm Jitter subtracted calibrations Cavity frequency correction Amplifiers were not sufficient. IP-BPMs Just installed to assist the small beam size study. Not yet well calibrated! Further investigations are continued. BPM number 5/27

  6. Fast Kicker R&D at ATF • The fast kicker R&D has been one of the missions at ATF for the ILC technology development. • The bunch separation in the ILC damping ring is • 6 ns for a nominal operation (RDR, SB2009), • 3 ns for a possible luminosity upgrade. • ILC fast kicker: should meet these requirements, 0.6 mrad ~20 units • 1.5 MHz, +-10 kV, Stability <0.1%, Multi-units of strip-line kicker +10kV -10kV 6/27

  7. Fast Kicker R&D at ATF Demonstration of a Beam Extraction (2009~) Swap the conventional pulse kicker with the fast kicker but only in this R&D period Pulser performance study (2005~2009) It has been done here by measuring the beam oscillation.

  8. Requirement for ATF beam extraction • The fast kicker R&D for a beam extraction had been performed by exchanging the conventional pulse magnet.It was done only when the study was scheduled because its reliability for other R&Ds was not known well. • The beam extraction system of ATFDR has to have a beam kickangle of 5 mrad. It is difficult to realize by a fast kicker itself under the limited space obtained by replacing the conventional pulse magnet. • Therefore, we needed followings. • pulsed orbit bump in DR as much as possible when a beam is extracted, • aux. septum magnet before the present one, • finally, optimize a gap between two electrodes but as large as possible. 8/27

  9. Beam Extraction Orbit using Strip-line Kicker, Aux. septum & Pulse bump Bump orbit To existing septum magnets Stored beam Local Bump Extracted beam 9/27

  10. (FID Co. Ltd) 10/27

  11. Rise time 1.5 ns Rise time 5 ns Kicker pulse (10kV) Kicker field 11/27

  12. 12/27

  13. Trigger system for fast kicker Beam extraction signal Fine delay control window of the kicker pulse

  14. Single-bunch beam extraction by a fast kicker

  15. 1st Beam Extraction from DR to ATF2 2009.Oct. 22. Beam profile at MS1X screen monitor, which is located at the downstream of the septum magnets. 15/27

  16. Kick angle jitter of a fast kicker for single bunch Fast Kicker ATF2 Cavity BPMs Stability of the fast kicker was evaluated by using R12 and beam positions measured with the 100 nm-resolution BPMs. Jitter 1.05e-6/3e-3=3.5e-4 Jitter 2.24e-6/3e-3=7.4e-4 2010/Mar 2010/Oct Angle (urad) Angle (urad) 16/27

  17. Multi-bunch beam extraction by a fast kicker

  18. Multi-bunch beam extraction by the Fast kicker 3 trains in DR • in DR: • 3 Trains, • 9(max 10) bunches/train with 5.6 nsec spacing • Extracted: • 27(max 30) bunches with 308 ns spacing • bunch-by-bunch profile follows that in the DR. • bunches were extracted from the last bunch to the first bunch. Intensity of extracted bunches 18/27

  19. MB-Orbit and jitter measurement Kick Angle variation for pulses Stability of each pulses Pulses Pulses The jitter ratio for the kick angle was distributed from 1x10-3 to 4x10-3 for each pulse. This value is larger than the single bunch jitter. 19/27

  20. Profile of the kick field and the jitter Kick field scan • Plot shows the beam position at MQM16FF BPM, when scanned the kicker pulse timing. • There is no flattop of the kick field. • The jitter increased at the both side of the peak. • To make stable beam kick, careful timing adjustment of four pulses is needed. BPM x-position (um) 200ps Trigger Timing (ns) 20/27

  21. 1st results of multi-bunch extraction, 2010/06/17 HV pulse arrival Relative (ns) Very much complicated. Different behavior on each pulser! Extracted beam intensity Extracted beam position (x) Pulse number The intensity of each bunch was not flat and unstable. The x-position of extracted beam was clustered as bi-stable. 21/27

  22. 22/27

  23. Timing adjustment circuit was installed w/o delay Relative (ns) Pulse number with delay Use for beam extraction Relative (ns) Not perfect but much better Pulse-train delay adjustment circuit; common trigger for each pulser is adjusted pulse-by-pulse. No inter-pulser adjustment. Pulse number 23/27

  24. 2nd results of multi-bunch extraction, 2010/10/26 30 bunches of the beam are stored to the DR, stably. Stable beam extraction was confirmed at the extraction line. The beam reach to the beam dump without any beam loss. 24/27

  25. INFN stripline for the study at ATF • Collaboration of KEK and INFN • Low impedance stripline based on the design for DAFNE • It was delivered to ATF in March 2011. We will install it in DR for the evaluation of impedance, but not for a beam extraction. Photos were taken just a day before earthquake! 25/27

  26. Difficulty under the higher current “at ATF” 2hour Blue: Stored current in DR 9 bunch 1 train Itot=2x1010 9 bunch 3 train Itot=6x1010 single bunch 1 train The stored current decreased gradually when the total current becomes higher. It was recovered after several minutes. We suspect the physical deformation of the strip-line electrode due to the heating by wake or SR. Challenging “small gap to enable the extraction at ATF” may leads this difficulty. This may be an issue “only at ATF”. 26/27

  27. Conclusion The beam extraction by a fast kicker system has been successfully demonstrated at ATF. Further studies on the improvement of the pulser performance and its reliability for long term operation should be continued, but it will not request a beam. Honestly, we have a difficulty on the fast kicker operation under higher intensity beam. It is due to the design under the limited space for extraction in ATF. Further, we will proceed a beam test of the low impedance stripline designed and delivered by INFN, Italy in a near future. 27/27