Order No. 1000 Compliance Attachment K edits. -Paul Peterson and Sarah Jackson Synapse Energy Economics May 24, 2012 Transmission Committee meeting. Order 1000 Background. FERC Order 1000 references to consideration of public policy requirements

bairn
Download Presentation

Order No. 1000 Compliance Attachment K edits

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Order No. 1000 ComplianceAttachment K edits -Paul Peterson and Sarah Jackson Synapse Energy Economics May 24, 2012 Transmission Committee meeting

  2. Order 1000 Background • FERC Order 1000 references to consideration of public policy requirements • ¶ 207 Transmission providers must develop procedures • ¶ 208 Local and regional flexibility in procedures • ¶ 209 Stakeholder input in procedures • Compliance filing needs to include a process for identifying and considering public policies and their impact on transmission needs • Part of stakeholder process • Information to stakeholders • Annual RSP ten-year forecast 2

  3. Proposal for Attachment K • Include definition of Public Policy • Public Policy Requirements shall refer to policies pursued by state or federal entities, where such policies are reflected in enacted statutes or regulations, including but not limited to, state renewable portfolio standards, energy efficiency programs, and requirements under Environmental Protection Agency regulations. • Reference Public Policy analysis in relevant sections of Attach K • ISO or any stakeholder may propose a public policy requirement

  4. Synapse edits to Attachment K • Definition added at start of document • Six references prior to Section 4.A. • Sec. 2.2 PAC provides input and comment on PP assumptions • Sec. 3.2 RSP Baseline will include PP requirements • Sec. 3.4 RSP principles include PP requirements • Sec. 3.6.c updating RSP project list will include consideration of changes to public policy requirements • Sec. 4.1.a.iii triggers for needs assessments may include PP requirements • Sec. 4.1.f PAC input on planning considerations

  5. Summary • Consideration of public policies enacted by statue, rule, or regulation is essential to good planning • EE Forecast • Analysis of EPA regulations on retirements • Order 1000 requires system planning to account for public policies • Proposed Attachment K edits provide a minimal and flexible process for both complying with Order 1000 and improving system planning in New England.