FERC Order 1000

FERC Order 1000. Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO , Columbia Grid, NTTG, WestConnect Interregional transmission facilities are those that are located in two or more neighboring transmission planning regions

javan
Download Presentation

FERC Order 1000

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FERC Order 1000 • Drafting team activated • April Filing • Interregional Coordination • Transmission Planning Regions • CAISO, Columbia Grid, NTTG, WestConnect • Interregional transmission facilities are those that are located in two or more neighboring transmission planning regions • No requirement to produce interregional transmission plan • Planning and Cost Allocation • Stakeholder Meeting Jan 30 Fulsom

  2. 2013 NTTG Planning Activities Q5 Jan-Mar 1. Facilitate stakeholder review and comment on draft Biennial Transmission Plan 2. Receive updated information on Q1 data 3. Receive and prioritize 2013 Economic Study Requests Q6 Apr-Jun 1. Develop Economic Study Request Study Plan 2. Update Biennial Transmission Study Plan with updated (material) information if received 3. Perform additional analysis for Biennial Transmission Study Plan if required Q7 Jul-Sep 1. Conduct Economic Study Request study 2. Facilitate stakeholder review and comment of draft final Biennial Transmission Plan Q7 Oct-Dec 1. Develop Economic Study Request report 2. Submit Biennial Transmission Plan to Steering Committee for approval

  3. 2013 NTTG Planning Activities Feb 7 Biennial Plan Stakeholder Meeting 10 a.m. to 3 p.m. (Mountain) Salt Lake City UAMPS Conference Room 155 North 400 West, Suite 480 (Same building as WECC offices) More detail on NTTG Website www.nttg.biz