An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SubWG on ReliabilityCERN26 March 2004 Reliability of the Quench Protection System for the LHC s.c. Elements F. Rodriguez-Mateos and Antonio Vergara (both TS now, AT when the work was done)

  2. References on the subject • “Reliability of the Quench Protection System for the LHC s.c. Elements”, PhD thesis, Antonio Vergara Fernandez, Nov’03 • Accelerator Reliability Workshop, Grenoble, Feb’02: “Machine Protection and Interlock System for the LHC”, R. Schmidt • European Particle Accelerator Conference EPAC, Jun’02: ”Reliability Analysis for the Quench Detection in the LHC” • What do we hope to achieve for the LHC quench protection and beam availability?, F. Rodriguez-Mateos and A. Vergara, Chamonix 2003 • Reliability of the Quench Protection System for the LHC s.c. Elements, A. Vergara and F. Rodriguez-Mateos, Nuclear Instruments and methods, Section A, pre-print accepted, to be published • CERN Machine Protection Working Group, Nov’01 • External Review of the LHC Quench Protection System, Dec’01 • CERN Electrical Enginnering Working Group, Jun’02 • LHC Main Ring Committee (MARIC), Aug’02

  3. Overview • Channels provoking a Power Abort in QPS: • Quench detectors: availability on demand (missing a quench is dangerous!) • False triggers (false quenches, spurious opening of breakers, accidental HDS discharge) • Channels giving the QPS Power Permit: • Baseline: • PP given only when 100% of the QPS system is available (including redundancies) • PP from QPS is only considered by the PICs for the start-up, not during operation (only needed after a power abort) • Estimations on expected global reliability: • Input data, boundary conditions • Results: impact on designs (redundancy, powering, alternatives) • Maintenance/monitoring strategies • Maintainability: • Maximum repair period to reach desired reliability

  4. QPS Reliability: Motivation • Why a reliability study? • QPS is a fundamental system of the LHC directly related to: • Commissioning Success. • Useful operational time. • Total lifetime and cost. • Lack of experience and studies of reliability in this field. • Where can the results be applied? • System Design. • Operational Strategy: • Supervision. • Power permit and abort. • Inspection and repairs. • Safety: hazard analysis.

  5. QPS Dependability • Experience (mainly String-2, String-1 and also test benches) and simulations have proven that QPS, when it is fully available, can assure the integrity of all the LHC superconducting elements. • This dependability study includes: • Experimental and/or theoretical validation of the protection strategies. • Validation of the components under the expected radiation environment. • Reliability modelling using RESQP. (REliability Software for Quench Protection Studies) • Its calibration (not to forget!) • Optimisation of subsystem designs considering: • Redundant Topologies. • Maintainability. • Space Constraints. • Machine Operation. • Cost. • Sensitivity analysis • Outlook of the QPS maintenance strategy. • Estimation of the QPS impact on the overall LHC performance.

  6. The study was applied to … • Quench detectors • Quench heater power supplies • Energy extraction The results were applied to … • Designs: redundancies and voting schemes • Preventive maintainability strategies

  7. Redundant Quench Detectors: States AC-DC Analog Logic k-oo-n n Detector Available Safe Failure. Downtime ( 5 h) False Quench 4 Possible States Dangerous Failure. Downtime (0 h) Magnet Unprotected Missed Quench Main Failure. Downtime ( ??? h)

  8. DQQDL (MB, MQ): Maintainability (e.g. 2oo4) • Maintenance: Inspection and Repair. Two possible checks foreseen: • Coherency Check (CT): Flag showing ‘n’ channels coherency. PERMANENTLY AVAILABLE Flag=0 OK Flag=1 WARNING Improves false quench reliability if repaired Flag k-oo-n • Quench Test (QT): Amplifier outputs after quench-test signal from CR. Quench Test (required over the machine life) Improves unprotected magnet reliability Flag=0 Flag=1 => repair

  9. - Reliability Data - Maintenance Bath-Curve Poisson System Structure Function Component Availability FQ UM Random Walk Renewal Theory MQ Downtime Markov Modeling Fault Trees Failure Dependencies Machine Status Component Failure Screening RESQP REliability Software for Quench Protection Studies MIL-HDBK Spec sheets Manufact. data - Expected Quench Rate Failure ‘costs’ (weight function) - Maintenance RESQP

  10. 9 – 12 1 Power Supply 0.6 – 1.22 Power Supplies QD 1 k-oo-n QD 2 k-oo-n DQQDL: Topology & Maintenance 2016 units in LHC 41 % Yearly Quench Tests (Test mode+repair) Detected-Quench Reliability 99.1 % Monthly Quench Tests (id) (20 years) Yearly False Quenches Monthly repair after wrong-coherency flag Main Advantage: Maintainability

  11. PGA ADC DSP Calibration Switch PGA AC-DC AC-DC AC-DC AC-DC PGA ADC DSP Calibration Switch Inst Ampl PGA C HTS Inst Ampl Inst Ampl C RES Inst Ampl REF SRAM REF SRA Other Detector Families (1oo2 + double powering) Inner Triplet (DQQDT) Insertion Magnets (DQQDI) Corrector Magnets (DQQDG) Current Leads (DQQDC)

  12. QPS monthly tests are required… Over 20 years

  13. Energy Extraction 32 units in LHC 202 units in LHC • Operation: • All facilities in a powering sub-sector open after a quench in the main magnets. • High demand rate:  1530 demands/year/facility • Failures: • Switch opening failure  Solutions • Accidental opening (e.g. of more than one branch in a 13kA facility)  Spurious beam abort • Maintenance: • Post-mortem data after quench  very useful in this case • Scheduled tests 13 kA 600 A Fire arc quench heaters in MB/MQ Open back-up device

  14. 15 demands/year/facility (4 quenches/week) EE Reliability Main Failure Probability over 20 years 13 kA Monthly Tests Sensitivity analysis is one of the powerful features of RESQP (good relative precision) 600 A Monthly Tests

  15. Issues on EE reliability: • Post-Mortem analysis and monthly tests, together with repairs are most necessary • For the 13kA facilities, decision was taken not to use any backup device: if two of the breakers stay closed over the same branch, heaters are fired selectively • For the 600A case, the use of a third switchgear (of equal type, only as a back-up) pays off even for “lower” quality devices. • The advantages of these 600A breakers in front of the fuses are: cost and maintainability, as well as the fact that the latter are a better developed technology.

  16. Conclusions on QPS Reliability Probability of protecting LHC S.C. elements IN ALL quenches (20 years)

  17. Conclusions: Maintenance Strategy Repairs after monthly Quench Test (LHC QPS as good as new) Summary Repairs after a quench, before Power Permit, using PM

  18. Room for possible collaborations(are they still needed?) • UPC, Barcelona, Spain • Prof. Carrasco, Dep. d'Enginyeria Electrònica • http://www-eel.upc.es/~carrasco/carrasco.htm • Politecnico di Milano, Italy • Prof. Zio, Dipartimento di Ingegneria Nucleare • Montecarlo, safety-oriented, nuclear applications