1 / 12

CETC54 contributions Neil Roddis Apr 15, 2010

CETC54 contributions Neil Roddis Apr 15, 2010. CETC54. CETC54- ProCCfCETile. In Shijiazhuang Covering the area of 2 sq.km. Founded in 1952 Over 5000 employees (543 senior engineers, 1000 engineers). !!!!!!!!!!!!!!. 30 mins. 2 hours. 20 mins. 15 mins. CETC54- Layout.

ban
Download Presentation

CETC54 contributions Neil Roddis Apr 15, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CETC54 contributionsNeil RoddisApr 15, 2010

  2. CETC54 CETC54- ProCCfCETile • In Shijiazhuang • Covering the area of 2 sq.km. • Founded in 1952 • Over 5000 employees (543 senior engineers, 1000 engineers) !!!!!!!!!!!!!!

  3. 30 mins 2 hours 20 mins 15 mins CETC54- Layout Manufacturing Workshop

  4. CETC54- Laboratory JLRAT Joint Laboratory for Radio Astronomy Technology NAOC and CETC54

  5. What do CETC54 want to do? • Win large non-military export contracts • Last year $100M • Little profit from ASKAP • Manufacture and install all of the SKA dishes • Manufacture in China, re-assemble on site • Use their own fabrication technology • Session 12 tomorrow • Do most, if not all, of the mechanical design • Also em design • Manufacture feeds and receivers

  6. What would CETC54 be prepared to do? Manufacture a mount to TDP design Manufacture a complete antenna (DVAC) to the TDP optics design, but using panels. Virtually anything, if they thought it would lead to getting the big contract?

  7. CETC54: strengths • Enormous resources • Engineers • Skilled manpower • Sub-contractors • Excellent facilities • Manufacturing • Test ranges • Anechoic chamber etc. • Low labor cost • Fast response • Extensive satcom experience • Willing to embrace and develop new designs (ASKAP)

  8. CETC54: weaknesses • Minimal radio astronomy experience • But JLRAT should help • High noise designs • Used to working to satcom specs • Attached to established in-house technologies and design solutions? • But may be persuaded to adopt new solutions • Do it their way or not at all? • Resistant to suggestions about manufacture on site

  9. What should we ask CETC54 to do? • Build DVAC in parallel with DVA-1 to the same specification, but using panels. • Interesting test of alternative manufacturing technique • Integrate and test where? • Funded by NAOC and CETC54? • Manufacture the mount for DVA-1? • Only if funds are so short that this is the only way to build DVA-1.

  10. Welcome to NWIEE We are The North West China Research Institute of Electronic Equipment

  11. NWIEE/CETC39 Split from CETC54 in 1970s Similar capabilities and resources They have made hundreds of 9, 11 and 13 metre antennas. Also keen to win ‘The SKA Contract’

  12. End

More Related