280 likes | 501 Views
NPI Testing To NPI Production. Presented by Gretchen Beicher UW Medical Foundation and Laurie Burckhardt WPS September 21, 2007. University of Wisconsin Medical Foundation 1,000 + Medical School Faculty Physicians 300 Midlevel Providers
E N D
NPI TestingToNPI Production Presented by Gretchen BeicherUW Medical Foundationand Laurie BurckhardtWPS September 21, 2007
University of Wisconsin Medical Foundation • 1,000 + Medical School Faculty Physicians • 300 Midlevel Providers • 51 UW Health clinical practice locations (exclusive of outreach) • 837 = 84% majority 837P = 266K clm/mo • FQHC 837I • Dental 837D • 835 = 88.9% of payments posted
WHAT did we do? • HOW did we do it? • OPPORTUNITIES we found • WHERE WE ARE NOW
CLEAN YOUR OWN HOUSE FIRST • TEST ENVIRONMENT = PRODUCTION • OPPORTUNITIES • Code modifications Legacy Dual Use NPI Only Modified NPI Only for rendering but not referring (Dissemination)
Edit modifications at all provider levels The FAV FIVE • FEDERAL TAX ID OR BILLING PROVIDER'S NPI/SSN ARE MISSING • RENDERING PROVIDER TAX ID/NPI MISSING OR INVALID • SUPERVISING PROVIDER NPI/TAX ID MISSING OR INVALID • TAX ID/NPI MISSING OR INVALID • REFERRING PROVIDER NPI/TAX ID OR SSN IS MISSING
Sync Enroll DB to PMS MF • NPI verifications – Luhn algorithm • MF Provider Specialty clean up • Taxonomy coordination (Enroll DB v. MF) • POS MF clean up
Gap Analysis • Top 20 • Contracted/Enrollment • Biggest Book • Document Approach Now we are ready……….maybe??
COMMUNICATION With Payors • Who wants and can test? • HOW? • OPPORTUNITIES
COMMUNICATION • Based on multiple factors • Gap Analysis • Readiness • Willingness • Relationship • Communication • Knowledge
HOW? • How and What are we testing? • NPI only or Dual Use or Modified version • Produce File? Return Response? • Document Outcome • Set date(s)
Are we ready? Target Date: May 23, 2007
May 18th – what happened? • UWMF contacted by five payors • Please test dual • Please test NPI only • Please send dual without testing • Please send NPI only without testing • Please send NPI only with testing completed
Opportunities -- Payor 1 – Dual Use • Test – Yes • Payor Provider environment differences • Dual Use – 03/14/07 • Pre-process reports • MESSAGES, MESSAGES, MESSAGES!! • Cross walk • Ref MDs M343 M329 M340 M342
M343 rendering provider PIN / NPI combination in loop 2310B does not exist in Medicare's crosswalk. • M340 - This error indicates that the billing provider PIN (Group Number) / NPI combination in loop 2010AA does not exist in Medicare's crosswalk • M342 - Referring provider NPI does not exist in Medicare's crosswalk. This edit was turned off shortly after it was turned on. • M329 - The NPI is invalid - based on the Luhn algorithm.
Effective August 27, 2007, for Minnesota and Wisconsin and September 4, 2007, for Illinois and Michigan, WPS Medicare will begin editing the NPI/legacy ID combinations for validity against the NPI crosswalk file. Where a match cannot be located on the crosswalk, claims will be rejected or returned to the provider.
Below are the dates which NPI edits will be turned to delete.
Recommendations for providers: • Begin dual strategy immediately! • Pay close attention to your prepass reports. • Send NPI only on a small percentage of claims (recommended 25 claims). Track claims with NPI throughout the claim process (e.g. compare to your remittance). • If results are as you expected, increase your volume of NPI only claims.
Opportunities Payor 1 – NPI Only • May 4, 2007 Test file sent • Results reviewed with payor • May 9, 2007 NPI ONLY!!!! • UWMF Timing considerations
Real Opportunity Awaits • NPI is not only an IT/IS function or number • Payor 1 communication May 11, 2007 • What is the difference between EDI and business reality? • Back to Dual Use May 12, 2007 What happened here?
I stole: “NPI Controlled Production Testing” Credit to Suzanne • Cow NPI Summit – June 22, 2007 • What is it??
NPI Controlled Production Testing • Portion of Production File • Build Phase 1 • 5 claims/3000 claims Phase 2 • ~790 claims/3000 claims Phase 3 • Full NPI ONLY = August 30, 2007 Consider timing and payment floor for all phases
NPI Controlled Production Testing • Phase 1 results • 5 claims/3000 claims sent June 25, 2007 • All Claims adjudicated according to standard on July 12, 2007
NPI Controlled Production Testing • Phase 2 • 500 claims/3000 claims (790+) • August 10, 2007 • Three options • Build from scratch • Limit file size and delay other claims • Process when end users on system • Timing • Medicaid crossover payments were received • September 5, 2007
NPI Only Controlled Production Testing • Phase 3 NPI ONLY • Target Late August 2007 • NPI ONLY August 30, 2007
NPI – ARE YOU USING IT? • YES!!
NPI TestingToNPI Production QUESTIONS??