1 / 19

Peco Facet Sewage Water Treatment Plant

Peco Facet Sewage Water Treatment Plant. STP 16 HA. Peco Facet Sewage Water Treatment Plant. Project Information. Project: …………………………………………….….. Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic

barb
Download Presentation

Peco Facet Sewage Water Treatment Plant

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Peco Facet Sewage Water Treatment Plant STP 16 HA

  2. Peco Facet Sewage Water Treatment Plant Project Information Project: …………………………………………….…..Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic Detailed design …………………….... “AzerDovletLayihe” State Design Institute Civil works: ……………………………………………………….… “EL-SEYM Insaat” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….July 2011 Facet model: …………………………………………………………………………..STP-16HA Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: …………………………………………………………….04.05.2012

  3. Peco Facet Sewage Water Treatment Plant Lankaran City R Republic of Azerbaijan 270 kilometers from capital Baku Lankaran

  4. Peco Facet Sewage Water Treatment Plant http://courts.az/lankarangravecrimes/?lng=en Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Facet STP unit

  5. Peco Facet Sewage Water Treatment Plant Waste Waters formed in toilets and kitchen to the Sewage Water Treatment Plant installed by Facet Facet STP unit The unit has been build behind the Court walls

  6. Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HA Facet scope: BasicDesign, Engineering, Supply of Equipment, Installation and Start-up All civil works and sewer network system was made by EL-SEYM Insaat LLC (local construction company)

  7. Peco Facet Sewage Water Treatment Plant Construction period – January 2012 Pumper well Aeration Chamber Aeration chamber & control room Place for Module Control room General View EL-SeymInsaat LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and Control Cabin According to drawings provided by Facet

  8. Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by sub-contractor of FACET GERMANY

  9. Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)

  10. Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections from Control Skid to the Module

  11. Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections between Aeration Chamber and Settling/Desinfection Module

  12. Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of BioFilm Media and Air Diffuser in Aeration Chamber

  13. Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Basket in pumper well Outlet Pipe to Collection box

  14. Peco Facet Sewage Water Treatment Plant Water Filling – May 2012

  15. Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-SeymInsaat LLC

  16. Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-SeymInsaat LLC

  17. Peco Facet Sewage Water Treatment Plant General Plan

  18. Peco Facet Sewage Water Treatment Plant Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) ……..6-10 mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent

  19. Peco Facet Sewage Water Treatment Plant Thank you for attention