210 likes | 528 Views
Peco Facet Sewage Water Treatment Plant. STP 16 HA. Peco Facet Sewage Water Treatment Plant. Project Information. Project: …………………………………………….….. Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic
E N D
Peco Facet Sewage Water Treatment Plant STP 16 HA
Peco Facet Sewage Water Treatment Plant Project Information Project: …………………………………………….…..Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic Detailed design …………………….... “AzerDovletLayihe” State Design Institute Civil works: ……………………………………………………….… “EL-SEYM Insaat” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….July 2011 Facet model: …………………………………………………………………………..STP-16HA Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: …………………………………………………………….04.05.2012
Peco Facet Sewage Water Treatment Plant Lankaran City R Republic of Azerbaijan 270 kilometers from capital Baku Lankaran
Peco Facet Sewage Water Treatment Plant http://courts.az/lankarangravecrimes/?lng=en Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Facet STP unit
Peco Facet Sewage Water Treatment Plant Waste Waters formed in toilets and kitchen to the Sewage Water Treatment Plant installed by Facet Facet STP unit The unit has been build behind the Court walls
Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HA Facet scope: BasicDesign, Engineering, Supply of Equipment, Installation and Start-up All civil works and sewer network system was made by EL-SEYM Insaat LLC (local construction company)
Peco Facet Sewage Water Treatment Plant Construction period – January 2012 Pumper well Aeration Chamber Aeration chamber & control room Place for Module Control room General View EL-SeymInsaat LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and Control Cabin According to drawings provided by Facet
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by sub-contractor of FACET GERMANY
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections from Control Skid to the Module
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections between Aeration Chamber and Settling/Desinfection Module
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of BioFilm Media and Air Diffuser in Aeration Chamber
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Basket in pumper well Outlet Pipe to Collection box
Peco Facet Sewage Water Treatment Plant Water Filling – May 2012
Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-SeymInsaat LLC
Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-SeymInsaat LLC
Peco Facet Sewage Water Treatment Plant General Plan
Peco Facet Sewage Water Treatment Plant Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) ……..6-10 mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent
Peco Facet Sewage Water Treatment Plant Thank you for attention