Peco Facet Sewage Water Treatment Plant Project Information Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...“AZIMPORT” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….April 2011 Facet model: …………………………………………………………………………..STP-16HB Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: …………………………………………………………….24.12.2011
Peco Facet Sewage Water Treatment Plant Imisli town Republic of Azerbaijan 300 kilometers from capital Baku
Peco Facet Sewage Water Treatment Plant Olympic Sport Complex Imisli, Republic of Azerbaijan Facet STP unit Panorama view
Peco Facet Sewage Water Treatment Plant Waste Waters formed in toilets, showers and/or kitchen flows to the Sewage Water Treatment Plant installed by Facet Facet STP unit
Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HB Facet scope: Design, Engineering, Supply of Equipment, Supervision of Installation and Start-up All civil works and sewer network system was made by AZIMPORT LLC (local construction company) – www.azimport.az
Peco Facet Sewage Water Treatment Plant Construction period – July 2011 Sport Complex back view Facet checks all constructions Aeration Chamber Control room Pumper well Azimport LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and House for the Control Room According to drawings provided by Facet
Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by AZIMPORT LLC under supervision of Facet specialists
Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of Settling and Disinfection Chamber by Crane
Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)
Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Grinding Pumps (main and stand-by) and Screen Bar into the Pumper Well
Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Piping works, Aeration Diffusers, Outlet Pipe
Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of Bio-Film Media into the Aeration Chamber General Piping Works
Peco Facet Sewage Water Treatment Plant Start Up and Commissioning – December 2011 Facet specialists has carried out the operation training course to the staff of Final Customer (Administration of Sport Complex)
Peco Facet Sewage Water Treatment Plant General Plan
Peco Facet Sewage Water Treatment Plant Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) ……..6-10 mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent
Peco Facet Sewage Water Treatment Plant Opening Ceremony of the Imisli Olympic Sport Complex with participation of his Excellency the President of the Republic of Azerbaijan Mr. IlhamAliyev
Peco Facet Sewage Water Treatment Plant Opening Ceremony - 2011
Peco Facet Sewage Water Treatment Plant Opening Ceremony - 2011
Peco Facet Sewage Water Treatment Plant Thank you for attention