180 likes | 293 Views
Performance-Based Monitoring Analysis System. 2013 Results. Guiding Principles of the PBMAS. Guiding Principles of the PBMAS. Guiding Principles of the PBMAS. Performance Indicators. Performance Levels. Hurst-Euless-Bedford ISD. 2013 PBMAS Results. Change in Performance Levels.
E N D
Performance-Based MonitoringAnalysis System 2013 Results
Hurst-Euless-Bedford ISD 2013 PBMAS Results
Bilingual Education/ESL Level 1 Indicators • Bilingual STAAR 3-8 Passing Rate in Writing • ESL STAAR 3-8 Passing Rate in Mathematics • ESL STAAR 3-8 Passing Rate in Reading • ESL STAAR 3-8 Passing Rate in Science • LEP STAAR 3-8 Passing Rate in Writing • LEP RHSP/DAP Diploma Rate Level 2 Indicators • ESL STAAR 3-8 Passing Rate in Writing
Career & Technical Education Level 1 Indicators • CTE Nontraditional Course Completion Rate - Females
No Child Left Behind Made Required Improvement • Title 1, Part A RHSP/DAP Diploma Rate (from 66.7 to 69.7)
Special Education Made Required Improvement • Special Education Representation (from 9.1 to 8.8) Level 1 Indicators • SPED Year-After-Exit STAAR 3-8 Passing Rate – Writing • SPED Placements in Instructional Settings 40/41 (Ages 6-11) • SPED Placements in Instructional Settings 40/41 (Ages 12-21)
Special Education Level 2 Indicators • SPED STAAR Participation Rate • SPED STAAR Modified Participation Rate • SPED Placements in Instructional Settings 40/41 (Ages 3-5) • SPED Discretionary ISS Placements
Texas Accountability Intervention System (TAIS) TAIS Continuous Improvement Process Diagram