1 / 3

Title of Presentation

Title of Presentation. Name Title Company Name. Diversion System Using Existing Sanitation Pipe . Basin 1. Pump Station . Disilting Basin. Basin 2. San Jose Reclaimed Pipeline. Headwork. Two Service Connections. Concrete Lined Diversion System .

baris
Download Presentation

Title of Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Title of Presentation Name Title Company Name

  2. Diversion System Using Existing Sanitation Pipe Basin 1 Pump Station Disilting Basin Basin 2 San Jose Reclaimed Pipeline Headwork Two Service Connections Concrete Lined Diversion System

  3. Diversion System Using Existing Sanitation Pipe • Seep/W • Current seepage rate • = 4.44 ft3/day • Reduced seepage rate • = 2.94 ft3/day • Advantages • Eliminate use of the canal • Minimize use of disilting basin • Utilize the existing pipe • Flexibility of water flow • Disadvantages • Need permission and • coordination from LA • Sanitation District

More Related