200 likes | 583 Views
Structure. O-QIS: Overview O-QIS: MCA/CMM Reporting O-QIS: Monitoring O-QIS: Alert Manager procella Automatic Evaluation (Evaluation Strategy ) Datamanagement (Archiving) M-QIS: Automatic Reporting System M-QIS: Data Compacting/ Long Term Analysis
E N D
Structure • O-QIS: Overview • O-QIS: MCA/CMM Reporting • O-QIS: Monitoring • O-QIS: Alert Manager • procella • Automatic Evaluation (Evaluation Strategy) • Datamanagement(Archiving) • M-QIS: Automatic Reporting System • M-QIS: Data Compacting/ Long Term Analysis • M-QIS: Alert Manager forcentralAlart Managing • Interfaces to SAP • ProductOverview <Q-DAS Presentation2010.pptx>
O-QIS: Overview Manual data entry and gage connections via serial interface. Visualization, assessing and storing the data in the database. Data RS-232 / USB Testplaning Measuring and storing Data Measureagain The CMM provides the data as a Q-DAS file. The single measurements are visualized and assessed. Acceptedmeasurementsaretransferredintothedatabase. Data as a File Central Q-DAS Database CMM Process data is displayed next to the facility to allow rapid interventions. Thetatais also tranferred to thedatabase. Convert to Q-DAS File SPS Data Individual valuechart Overview Parts/Characteristics Alarm on Machine5 The contents of the database is monitored for alarms. On a centralplacethesealarmscouldbedisplayed . Theoperator has theposibility to quitthealarms. Alarme laden <Q-DAS Presentation2010.pptx>
procella 18,098 18,162 18,060 18,098 18,098 18,158 18,100 18,200 18,150 10,100 10,015 10,016 10,037 10,059 10,020 10,020 10,100 10,020 20,024 20,020 19,848 19,948 19,986 20,050 20,014 20,010 19,998 18,060 18,100 18,130 18,100 18,220 18,200 17,992 18,220 18,040 24,910 24,880 25,023 25,100 25,050 24,990 24,984 24,984 25,100 Shaft WE-328455 4711 M-451256_L2 95624173 17,900 19,950 24,900 9,900 17,980 DB Test Plan n Test Plan 2 ok Q-DAS Keyboard Gage <Q-DAS Presentation2010.pptx>
O-QIS MCA/CMM Reporting Decline Measurement measure again central DB Q-DAS MCA/CMM Reporting Report yes not ok ok ALARM ? Accept Measurement ? no local DB <Q-DAS Presentation2010.pptx>
O-QIS: Q-DAS®Monitoring Part overview Operations Processparameters (PLC) Characteristicsoverview Export tofiles in Q-DAS Data Format O-QIS Measurement values <Q-DAS Presentation2010.pptx>
O-QIS: Alert Manager Alarm on Machine5 Valuethatcausesthe Alarm Overview of the Parts on Machine 5 Overview of Machines <Data_Collecting_Assessing.ppt/Q-DAS GmbH & Co.KG> <Q-DAS Presentation2010.pptx>
Data Managing upload manager synchronisation Archiving central database DB performant slow <Q-DAS Presentation2010.pptx>
Automatic Evaluation with qs-STAT selection DB positional tolerance Po/Pok:MPo2 MPo2: Po = 1,78 Pok= 1,70 M4: Cp = 1,58 Cpk= 1,48 <Q-DAS Presentation2010.pptx>
M-QIS: Reporting System: Triggeredby time orevent selection Reporting System zentraleDB 2:14 PM 6:00 1:00 3:00 5:00 0:00 4:00 2:00 7:00 Alarm Machine 4 <Q-DAS Presentation2010.pptx>
M-QIS: Alert Manager forcentralalarming Measurements Alarm <Q-DAS Presentation2010.pptx>
M-QIS: Q-DAS Data Compacting / Long-term Analysis Selection Raw values DB View results and reports Q-DAS Data Compacting Cpk = 1,64 Cpk = 1,23 Results and reports <Q-DAS Presentation2010.pptx>
Interfaces to SAP selection SAP DB test plan IDI STI ^ Q-DAS Statistikserver procella measuring station local DB qs-STAT Workstation qs-STAT Server measuring measuring finished <Q-DAS Presentation2010.pptx>
Q-DAS®Products O-QIS qs-STAT System permanenter Datenstrom Q-DAS SAP Server O-QIS M-QIS (Reporting System) CMM Q-DAS Database Raw Values procella orO-QIS Analysis Compacting Verdichtung M-QIS (Data Compacting LTA) manualorserial RS232 M-QIS (Web) <Q-DAS Presentation2010.pptx>