1 / 9

Closed Loop Processing at Associated Newspapers (UK)

Closed Loop Processing at Associated Newspapers (UK). Summary. Closed Loop CTP Plate Production Extended Closed Loop across ANL Integration Blueprinting. A Definition of Closed Loop.

bayard
Download Presentation

Closed Loop Processing at Associated Newspapers (UK)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Closed Loop ProcessingatAssociated Newspapers (UK)

  2. Summary • Closed Loop CTP Plate Production • Extended Closed Loop across ANL • Integration Blueprinting

  3. A Definition of Closed Loop A closed loop process is one that dynamically feeds information back into itself in order to optimize the process as it is running.

  4. AGFA’s CTP Closed Loop Solution • Collects, stores and reports on process data. • Dynamic feedback to effect corrective actions that keep the system optimized. • Alerts on system performance / instabilities including recommendations for corrective action.

  5. Variables • Exposure - CTP power settings vs actual exposure energy at plate). • Processing Speeds - Brush roller speeds. • Chemical Conditions – Chemical levels, replenishment frequency, conductivity level. • Temperatures – Bath, pre-heat. • Plate Batch Sensitivity – Shifts due to storage conditions, transport handling etc.

  6. Benefits • Reduced plate performance issues • Problem prevention rather than cure • Tracking / Troubleshooting assistance • Quality improvement / consistency • Reduced waste (time and consumables) • Product quality verification / audit

  7. Page make Up Process

  8. Page Production Process

  9. Integration Blueprinting Business / Technical Commentary Pairs ….. Business Flow / Architecture Implementation Tasks & Analytics Business Requirements Methodology (How to Implement) Project Management An Integration Blueprint minimizes the risks associated with IT projects and maximizes ROI.

More Related