An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Singapore – Infrastructure Projects Karmjitsingh Chairman ciltsingapore 4 july 2014

  2. Agenda • Changi Airport East Industrial / Logistics Project • Project Jewel at Changi Airport • Relocation of PSA Container Port to Pasir Panjang (Phase 1) and Tuas (Phase 2) • Development and Expansion of Seletar Airport & Aerospace Park • New International Cruise Terminal

  3. Agenda • E-Freight and IoT (Internet of Things) • High Speed Rail between SIN-KUL • Expansion of MRT Rail Network • New Generation of Logistics / Warehouses • Development of Modern Industrial Parks in Iskandar (South Johore) • Development of Industrial Parks in Bintan and Batam

  4. 1. Changi Airport East Industrial / Logistics Project Project description: New airfreight terminals, cargo centre for forwarders, logistics park and mail control Expected completion date: 2020 – 2022 Budget: SGD 1 Billion Project Owner: Changi Airport Group Capacity: 4.5 – 5.5 million tonnes

  5. 2. Project Jewel at Changi Airport Project description: World-class lifestyle destination for global travelers. The complex will offer aviation facilities, retail offerings and unique leisure attractions. Expected completion date: 2018 Budget: SGD 1.47 Billion Project Owner: Changi Airport Group Capacity: 24 million passengers per annum

  6. 3. Relocation of PSA to Pasir Panjang (Phase 1) & Tuas (Phase 2) Project description: PSA port to be relocated in two phases: (1) PasirPanjang Port and (2) Tuas Port Expected completion date: 2020 Budget: SGD 4.5 Billion Operated by: PSA Capacity: Additional 15 new berths

  7. 4. Development & Expansion of Seletar Airport & Aerospace Park Project description: Development of Seletar Airport designed to support industrial and business aviation activities. Expected completion date: End of 2014 Budget: SGD 60 Million Project Owner: JTC & EDB Capacity: 30 aerospace companies & an 1,800 m runway

  8. 5. New International Cruise Terminal Project description: Development of the Marina Bay Cruise Terminal Singapore for international passenger traffic. Completion date: 2012 Budget: SGD 450 Million Operated by: SATS Capacity: Able to berth two 3,000 pax cruise ships

  9. 6. E-Freight & IoT (Internet of Things) Project description: Using RFID to improve land/sea/freight information flow and productivity Expected completion date: 2017 Project Owner: CAAS & IDA

  10. 6. E-Freight & IoT (Internet of Things) Project description: Using RFID to improve land/sea/freight information flow and productivity Expected completion date: 2017 Project Owner: CAAS & IDA

  11. 7. High Speed Rail between SIN-KUL Project description: High Speed Rail (HSR) between Singapore and Malaysia to improve SIN-KUL intercity connectivity Expected completion date: 2024 Budget: SGD 15 Billion Operated by: ?

  12. 8. Expansion of MRT Rail Network Project description: Expansion and development of MRT rail network to serve extended areas and a greater number of commuters. Expected completion date: 2025 Budget: SGD 60 Billion Operated by: LTA Capacity: Increase from 160 to 320 km of track

  13. 8. Expansion of MRT Rail Network Project description: Expansion and development of MRT rail network to serve extended areas and a greater number of commuters. Expected completion date: 2025 Budget: SGD 60 Billion Operated by: LTA Capacity: Increase from 160 to 320 km of track

  14. 9. New Generation of Logistics / Warehouses (Green Logistics) Project description: Improve productivity and develop green buildings, green transport, green ports and green freight and logistics. By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and 11% increase in public transport usage. Expected completion date: On-going

  15. 9. New Generation of Logistics / Warehouses (Green Logistics) Project description: Improve productivity and develop green buildings, green transport, green ports and green freight and logistics. By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and 11% increase in public transport usage. Expected completion date: On-going

  16. 10. Development of Modern Industrial Parks in Iskandar (South Johore) Project description: Joint Malaysian and Singapore government collaboration Expected completion date: On-going

  17. 10. Development of Modern Industrial Parks in Iskandar (South Johore) Project description: Joint Malaysian and Singapore government collaboration Expected completion date: On-going

  18. 10. Development of Modern Industrial Parks in Iskandar (South Johore) Project description: Joint Malaysian and Singapore government collaboration Expected completion date: On-going

  19. 11. Development of Industrial Parks in Bintan and Batam Project description: Development of Bintan Industrial Estate and Batamindo Industrial Park for manufacturing companies. Expected completion date: On-going