1 / 1

Demonstration of RATC Algorithm for Emergency Crisis and its Stability Validation

Overflows Due to Unexpected Load Changes. Steady State Assessment. Demonstration of RATC Algorithm for Emergency Crisis and its Stability Validation. Top Area.

bazyli
Download Presentation

Demonstration of RATC Algorithm for Emergency Crisis and its Stability Validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overflows Due to Unexpected Load Changes Steady State Assessment Demonstration of RATC Algorithm for Emergency Crisis and its Stability Validation Top Area • In the 9 bus system, under unexpected generation loss in one area and thus shift of generation to other areas, overflows occur on the tie lines among left and right areas. • The load at bus Right2 must be shed by 11.5% to reduce the tie line flows to their limit (100%). Right Area • The steady state solutions match the DC flows closely. Overflows Trigger RATC Algorithm Left Area Dynamic response check Performance and benefits • Synchronism check : • Voltage check : • Tie line real power losses is divided evenly into areas. • Real power loss is reduced for all the three areas. • Stability margin is more than doubled. The critical clearing time for a solid three phase fault at bus Right 3 is increased from 0.2 seconds to more than 0.5 seconds. • Demonstrates RATC as a corrective control action. • Results show that switching lines can relieve overflows, improve stability margin, reduce loop flow/wheeling effects, and reduce system loss. • A line switching solution is found by RATC that opens the tie line between right area and upper area. • The overflow is relieved and no load shedding is involved. • The system is back into normal state from emergency state with N-1 criterion satisfied. • System settles down nicely after line switching.

More Related