1 / 5

SF LAFCO Energy Consultant(s) RFQ

Flynn & Associates offer expertise in addressing critical electricity issues such as transmission access, market design, interconnection agreements, energy supply, and price risk management. With extensive experience and a track record of success, they can provide strategic advice to senior management and policy makers.

bbentley
Download Presentation

SF LAFCO Energy Consultant(s) RFQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002 Flynn & Associates

  2. Critical Muni Electricity Issues • Transmission Access and Congestion Cost Mitigation • California Independent System Operator and Federal Energy Regulatory Commission Market Design Proceedings • Utility Interconnection Agreement Alternatives • Energy Supply Alternatives • Energy Price Risk Management Flynn & Associates

  3. Flynn & Associates can help SF LAFCO address critical electricity issues • Extensive experience providing strategic advice to senior management and policy makers • Barry Flynn has been a consultant for over 15 years (6 years for CCSF). Previous experience includes 10 years as director of a municipal electric utility, 8 years as transmission planner, 3 years as president of a renewable resources development firm • Doug Boccignone has been a consultant for over 8 years. Previous experience includes 3 years in municipal resources planning, and four years in energy origination • Experience in developing public power joint action agencies Flynn & Associates

  4. Specific Flynn & Associates’ Experience • Represent Bay Area Public Power entities on critical locational marginal pricing issues • Represent CCSF in Bay Area transmission alternatives evaluation • Permitting under way for new 230 kV line to San Francisco by 2005 • 2800 MW Bay Area transmission upgrade study • Represent CCSF as a member of ISO Planning Standards Committee • Developed Bay Area generation outage standard that resulted in additional transmission into Bay Area • Participated in ISO Stakeholder process and assisted CCSF legal counsel to reduce Bay Area transmission access costs Flynn & Associates

  5. Specific Flynn & Associates’ Experience • Represented CCSF in CPUC December 8, 1998 outage investigation • Resulted in improved outage restoration procedures • Special Protection Scheme to limit the amount of San Francisco load dropped and speed restoration following catastrophic events • Advised CCSF regarding Potrero 7 power plant interconnection, reliability and other transmission and supply issues • Represented CCSF in annual PG&E grid planning efforts • Advised CCSF on existing Hetch Hetchy/PG&E transmission agreement Flynn & Associates

More Related