1 / 4

HBD Meeting 2/28/06

Details from the HBD meeting on 2/28/06 regarding set-up, performance comparison, water and oxygen levels, and immediate to-do list for prototype improvement.

bdenman
Download Presentation

HBD Meeting 2/28/06

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD Meeting2/28/06 B. Azmoun BNL

  2. Triple GEM Test Set-Up • We set up a triple GEM stack made of Std. CERN foils for comparison with the GEMs of the HBD prototype. • Same activity source was used: 250uCi Fe-55. • Same spacing between GEM’s and mesh, and same field and voltage configuration were applied. • Although the gain of the prototype GEMs is similar to that of the test set-up GEMs, the rate is lower by almost a factor of 50! • This is still a mystery, but we have plans to investigate it. • Move source away from G-10 “cross” on frames…a long shot, but perhaps the cross charges up and creates undesirable space charge. • Other option is to test the GEMs of the prototype in the large GEM gain testing vessel at USB. HBD Meeting 2/28/06

  3. Water and Oxygen Levels in Prototype • After more than 2 weeks of flow, the water and oxygen levels in the prototype got down to single digit ppm’s (after subtracting off the baseline). • Therefore, we probably don’t need to modify the side panels. HBD Meeting 2/28/06

  4. Immediate TO DO list for Prototype • Continue investigation of low rate • Move Source holder into center of frame quadrant. • Test GEMs inside large GEM testing vessel • Fix gnd. connection to, or replace HV (SHV) feedthru’s. • The RMS noise has gone from 0.7mV, to ~2.5mV, due to flaky grounding. • Replace Mesh. • Replace thin gnd. wire inside HBD with thin braid for better gnd. connection to gnd plane. • Test and Install UV lamp • Install mounts for installation into PHENIX • Cover for PA’s (shield and protection) • New PreAmp PCB (install/test…noise) • Install new Temp and Pressure gauges. HBD Meeting 2/28/06

More Related