An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renewable EnergyScenario in Gujarat R. N. Pandya, Sr. Project Executive Gujarat Energy Development Agency Gandhinagar

  2. Renewable EnergyAn alternative energy solution for meeting increasing Energy Demand and limiting Environmental Hazards.The Clean & Green Sources of Everlasting Energy VIKSAT, Ahmedabad

  3. Renewable Energy Sources Tidal Solar Wind Geo Bio VIKSAT, Ahmedabad

  4. RE Potential - Gujarat VIKSAT, Ahmedabad

  5. Presuming that 1 % of wasteland, if set aside there is a potential of setting up 10000 MW Solar Power Plant VIKSAT, Ahmedabad

  6. National Action Plan on Climate Change • National Solar Mission • National Mission for Enhanced Energy Efficiency • National Mission on Sustainable Habitat • National Water Mission • National Mission for Sustaining the Himalayan Ecosystem • National Mission for a Green India • National Mission for Sustainable Agriculture • National Mission for Strategic Knowledge for Climate Change VIKSAT, Ahmedabad

  7. Jawaharlal NehruNational Solar Mission • Objective of the National Solar Mission is to establish India as a global leader in Solar Energy, by creating the policy conditions for its diffusion across the country as quickly as possible. • The immediate aim of the Mission is to focus on setting up an enabling environment for solar technology penetration in the country both at a centralized and decentralized level. • In Phase I (up to 2013) will focus on • capturing of the low hanging options in solar thermal; • on promoting off-grid systems to serve populations without access to commercial energy and • modest capacity addition in grid-based systems. • In Phase 2, after taking into account the experience of the initial years, capacity will be aggressively ramped up to create conditions for up scaled and competitive solar energy penetration in the country. VIKSAT, Ahmedabad

  8. Over ONE LAKH Solar Cookers have been distributed in Gujarat under State Subsidy Scheme in last 20 years. VIKSAT, Ahmedabad

  9. Solar Water Heaters Over 20000 domestic & industrial solar water heating systems have been installed in Gujarat in last decade totaling to daily capacity of 100-120 lakh litre per day. Acceptance of Solar Water Heaters has been best amongst other Solar Energy Systems and the market has developed on the basis of the strength of the product. VIKSAT, Ahmedabad

  10. Solar Air Heating Systems have found some scattered acceptance in food and dyestuff industries.Solar Industries have built capacities for designing and fabricating tailor made systems. VIKSAT, Ahmedabad

  11. Community Solar Cooker VIKSAT, Ahmedabad

  12. Solar Steam Generating Systemshave been applied for community cooking and industrial low pressure steam applications. About 10 Steam Cooking Systems have been installed in Gujarat – for cooking 1000 – 2000 meals per day. VIKSAT, Ahmedabad

  13. Solar PV Systemsespecially lighting in remote un-electrified areas have been successfully deployed barring high capital cost, maintenance and after-sales service problems.Solar off-grid systems – like solar pumping system, streetlight, homelights have been promoted with heavy subsidy. VIKSAT, Ahmedabad

  14. Solar PV Lighting Systems 5000 Solar Home Light 1000 Solar Lantern 2000 Solar Street Light VIKSAT, Ahmedabad

  15. Solar Power Pack VIKSAT, Ahmedabad

  16. Solar Rooftop Power Systems About 265 X 1 kW Stand-alone SPV power systems installed. 34 Grid-connected rooftop Solar PV Systems (2350 kW) have been installed on Govt Buildings in Gujarat last year. VIKSAT, Ahmedabad

  17. Solar Power Plants in Gujarat 30 plants totaling to about 600 MW capacity have been commissioned in Gujarat in year 2011-12. They would be generating 900 MU VIKSAT, Ahmedabad

  18. Wind Solar Hybrid Power System VIKSAT, Ahmedabad

  19. Wind Turbines Wind Speed – 2 to 5 m/s Wind Speed – 5 to 15 m/s Wind Speed – 10 to 25 m/s VIKSAT, Ahmedabad

  20. Gujarat has the second largest Wind Power Plant installed capacity in the country which is about 2625 MW . Annually generating about 4400 million units of electricity. WINDFARMS Gujarat Potential: 12000 MW Installed Capacity: 2625 MW tildate Cost: Rs. 5-6 crore VIKSAT, Ahmedabad

  21. Bio Energy Systems BIOGAS PLANT 1500 cubic mt/day added 21000 cubic mt/day added BIOMASS GASIFIER PLANT VIKSAT, Ahmedabad

  22. Gandhinagar Solar City Project Solar Rooftop Power Systems Target - 5 MW System – 4 MW govt blgs & 1 MW on houses GERC tariff Rs. 11.21 per unit Terrace Owner Rs. 3 per unit Implemented by GPCL & funded by GEDA 125 X 1 kW Rooftop SPV systems on Govt Bungalows 9 X 10 kW Rooftop SPV systems on Govt Buildings 40 kW Wind-Solar Hybrid Power System Solar Water Heating Systems on Govt Quarters VIKSAT, Ahmedabad

  23. State: Solar Power Policy • Solar Photovoltaic (SPV) • Target – 1000 approx MW. • PPA* @Rs.15/- per unit for first 12 years and @Rs.5/- for next 13 years • PPA* signed for 971.50 MW with 83 companies to be commissioned by December 2011 end • Period of PPA – 25 years • 600 MW Plants installed as on date • Govt would be spending about 1600 crores for 1080 MU generated by 600 MW Solar Power Plants in Gujarat VIKSAT, Ahmedabad * PPA – Power Purchase Agreement

  24. Gujarat: Plugging to Solar • Solar Radiation in Gujarat • @5.6 – 6.0 kWh/m2/day VIKSAT, Ahmedabad

  25. RE Power Purchase Policy • Wind Energy – Rs. 3:56 per unit • Solar Energy – Rs. 15 per unit (first 12 years) • Solar Energy – Rs. 5 per unit (next 13 years) • Bio Energy – Rs. 4.40 per unit • New Solar PP Policy (29-Jan-2012) • Solar Energy – Rs. 9.98 per unit (first 12 years) • Solar Energy – Rs. 7 per unit (next 13 years) VIKSAT, Ahmedabad

  26. Asia’s First Solar Park in Gujarat • Village Charanka, Ta:Santalpur, Patan 2024 hectares of wasteland • For setting up 3000MW Generation & Manufacturing Facilities • 200 MW Capacity Power Plants have been installed • GPCL is the Project Managers VIKSAT, Ahmedabad

  27. Total Installed Capacity of RE Systems in Gujarat1000 MWapproximately VIKSAT, Ahmedabad

  28. Barriers & Bottlenecks High initial cost and replacement of costly batteries in off-grid systems Sense of ownership – poor maintenance Lack of user awareness & training Poor after sales service network Quality of product and assured service life Failure of SPV systems distributed in electrified areas Lack of innovation in application & promotion VIKSAT, Ahmedabad

  29. Lastly About • GEDA – State Nodal Agency • MNRE – GOI Ministry and • IREDA – RE Financing Institution THANK YOU THE OPPORTUNITY TO SHARE & FOR SPARING YOUR VALUABLE TIME VIKSAT, Ahmedabad