40 likes | 241 Views
POWERGRID CORPORATION OF INDIA LIMITED. SOUTHERN REGION TRANSMISSION SYSTEM- SEP’04. TALCHER. FROM ER. CHANDRAPUR. JEYPORE. 178. 221. RAMAGUNDAM. 178. WARANGAL. 189. 200. 10. FROM KOLHAPUR. VISAKHAPATNAM. KHAMMAM. 317. HYDERABAD. 115. 267. SRSLM(AP). GULBARGA. 155.
E N D
POWERGRID CORPORATION OF INDIA LIMITED SOUTHERN REGION TRANSMISSION SYSTEM- SEP’04 TALCHER FROM ER CHANDRAPUR JEYPORE 178 221 RAMAGUNDAM 178 WARANGAL 189 200 10 FROM KOLHAPUR VISAKHAPATNAM KHAMMAM 317 HYDERABAD 115 267 SRSLM(AP) GULBARGA 155 2500 MW BIPOLE VIJAYAWADA 210 150 258 N’SAGAR RAICHUR KRNL(AP) 1369 172 500 MW BtB 341 160 MUNIRABAD 308 NARENDRA 98 279 110 158 GOOTY 61 KAIGA NELLORE SIRSI CUDDAPAH 254 DVNGRE(KN) HIRIYUR 302 174 TALAGUPPA 189 242 NELAMANGALA ALMTI(TN) 43 50 43 211 97 HASSAN BANGALORE KOLAR SPBDR 51 50 69 136 HOODY HOSUR MYSORE MELKTYR 30 181 126 182 NLC II EXP 215 PONDICHERY 5 53 BAHOOR 178 3 SALEM NLC II KOZIKODE NLC -1 EXP. 225 14 164 ARASUR 151 172 PUGALUR LEGEND TRICHY 78 130 TRICHUR 140 + 500kV HVDC BIPOLE LINE 2738 ckm 400kV LINES EXISTING 8360 ckm 400kV LINES UNDER CONSTRUCTION 2400 ckm 400kV LINES PROPOSED 4000 ckm 220kV LINES EXISTING 366 ckm OTHER UTILITIES LINE + 500kV HVDC BIPOLE TERMINAL AT KOLAR 1 + 500kV HVDC BACK TO BACK AT VIZAG 1 + 500kV HVDC BACK TO BACK AT VIZAG 1 400/220kV EXISTING S/S 18+1(GIS) 400/220kV S/S UNDER CONSTRUCTION 3 400/220kV S/S PROPOSED 6 130 UDUMALPET KARRIKUDI COCHIN 127 MADURAI PALLOM 47 217 KAYANKULAM 78 TIRUNELVELI EDAMON KUDAKULAM APP TRIVANDRUM