An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Treasury Presentation - Portfolio Committee on Water Affairs and Forestry 4 June 2003 Draft

  2. 2003/04 Priorities • Review of the equitable share • Formula • Enhance municipal revenue • Property Rates Bill • Municipal Finance Management Bill • Restructuring • Electricity distribution industry • RSC levies • Infrastructure grant reforms Draft

  3. Components of 2003/04 equitable share • Equitable share allocation R6,3 billion • less R293 Allocation R381 million • Amount distributed via formula R5,9 billion • S-grant (including guarantees) R4,1 billion • I-grant R450 million • Nodal Allocation R212 million • Free Basic Services R822 million • Free Basic Electricity R300 million Draft

  4. Free Basic Services • Separate window created for 2003/04 for funding free basic services (FBS) • The aim is to assist municipalities to accelerate the provision of FBS to poor communities • FBS include water, sanitation & refuse removal • Allocation for 2003/04 is R822 million on top of S-grant allocation Draft

  5. Free Basic Services • It is estimated that 76% of municipalities provide the first 6kl of water free • wide ranging levels from 1.2 kl to 12 kl • The free basic services policy does not extend to sanitation beyond basic levels of on-site sanitation (eg. VIP) • Information on how free basic services are provided in rural areas is poor Draft

  6. Division of Revenue Act, 2003 • Section 5(7)(ii) requires municipalities to: • Submit to NT, provincial treasury & provincial local government department not later than 30 June 2003: • budget for the financial year and other budgetary info required by NT on nature and extent of basic services (including FBS), to be provided by the municipality • Section 5(7)(iii) requires municipalities to: • Submit NT, dplg & provincial local government department not later than 10 days after end of each quarter information on actual revenue & actual spending on: • water, electricity, refuse removal, municipal infrastructure and free basic services Draft

  7. Division of Revenue Act, 2003cont. • Section 8: • (1) An organ of state in the national and provincial sphere may only provide funds for a municipal service to the relevant municipality directly • (2) Public entity and municipality must enter into a service delivery agreement by 30 June 2003 • (3) Public entity must also report on a monthly basis on the amount spent on received funds from municipality Draft

  8. Transfer of Water Schemes- Policy Objectives • Constitutional & legislative requirement on municipal authority • Complying with DoRA requiring infrastructure transfers to municipalities to be made in terms of an approved policy framework • Providing a framework within which to achieve measurable outputs identified in DoRA • Enhancing certainty, predictability & transparency of transfers & ensure sustainability without reducing current levels of service • Setting principles to guide the transfer of assets, staff, water services infrastructure and the provisionfunction from DWAF Draft

  9. Transfer of Water Schemes • Water Services Operating Subsidy (via augmentation to the Water Trading Account) provides for operation maintenance and related staff costs of water services works to be transferred • This operating subsidy is treated as a grant in kind whilst DWAF or a water board fulfils the role of WSP, to cover the services provision costs until transfer is effective • The operating subsidy is converted into a conditional grant (direct transfer) once transfer is effective to cover O & M costs plus staff costs • The operations component of the grant is a fixed term grant, which for a period of three years covers 100% of the operation and maintenance costs. Draft

  10. Transfer of Water Schemes • Available to WSAs from 1 July 2003 to 30 June 2006 • Actual time period that the WSA receives 100% of this grant depends on the effective date of transfer • Substantial personnel implications as DWAF expects to transfer approximately 8100 staff to LG Draft

  11. Transfer of Water Schemes -Allocation • Adjustments - Increase for refurbishment of water schemes for 2003/04, 2004/05 & 2005/06 is R60m, R90m and R120m • Aim of the allocation is to refurbish the water schemes prior transfers • Transfers expected to take 6-7 years • The transfer process experienced a delay with the finalisation of Powers and functions to between Category B and C municipalities Draft

  12. Information required • Type of scheme? • Number of beneficiaries? • Number of personnel affected? • Tariff and pricing policy? • Revenue collected? Draft

  13. Cross-Subsidisation of Water Schemes • In cases where: • A water services works is designed for levels of service that are not affordable to the consumers, and/or • Where most or all water provided by the water services works qualifies as Free Basic Water • It may be impossible to recover costs and maintaining the water services works in both cases • If the WSA is unable to cross-subsidise the water services works after phasing out of conditional grant • arrangements need to be made to provide support through an ongoing conditional grant • The conditions of this grant will include measures to improve cost recovery linked to performance targets Draft