U.S. Highway 220 Upgrade

U.S. Highway 220 Upgrade. Mayor and city council September 16, 2008. Overview of Project. Joint effort between WVDOH & MD SHA Provide widened highway corridor between I-68 & Corridor H Based on North/South Appalachian Corridor Study Memorandum of Understanding between WVDOH & MD SHA

belle
Download Presentation

U.S. Highway 220 Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. U.S. Highway 220 Upgrade Mayor and city council September 16, 2008

  2. Overview of Project • Joint effort between WVDOH & MD SHA • Provide widened highway corridor between I-68 & Corridor H • Based on North/South Appalachian Corridor Study • Memorandum of Understanding between WVDOH & MD SHA • Utilizing the “Consolidated” planning approach • Corps, FWS, & Natural Resource Staffs involved (IAWG) • Environmental Factors Included Early in Process • Two Tier Process • Tier 1: Evaluate Alternative Corridors at Planning Scale • Tier 2: Evaluate Alignments Within Corridor(s) at Engineering Scale

  3. Study Area Boundaries

  4. Initial Corridors Studied

  5. Current & Project Traffic Volumes

  6. Traffic Capacity Constraints

  7. Design Deficiencies

  8. High Accident Areas

  9. Refined Corridors Retained for Detailed Study

  10. Environmental Review Process • Tier 1 • Purpose & Need Statement – Completed 4/07 • Draft Alt. Retained for Detailed Study – Completed 4/07 • Draft Environmental Impact Study – Due 12/08 • 30-Day Comment Period Ends – 2/09 • Final Public Hearing (s) – Spring, 2009 • Revisions/Final EIS/Record of Decision – Spring, 2010 • Tier 2 • Evaluate Highway Alignments Within One or Two Final Corridors From Tier 1 EIS.