1 / 10

Applications

Information Technology. Applications. Assumptions. Go-Live – January 20 No Physical Trades Day 1 We will leverage Enron’s capabilities, but maintain physical separation of applications. Need for Transition Agreement. Negotiate license agreements

benita
Download Presentation

Applications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information Technology Applications

  2. Assumptions • Go-Live – January 20 • No Physical Trades Day 1 • We will leverage Enron’s capabilities, but maintain physical separation of applications

  3. Need for Transition Agreement • Negotiate license agreements • Prepare alternatives to those software applications not being transferred • Make a data center arrangement

  4. Day 1 • Hardware (on schedules) transfers to NETCO • Intellectual property (on schedules) transfers to NETCO • People (identified on schedules) transfer to NETCO • NETCO leases the hardware and contracts the people back to Enron • Enron provides services agreement that covers all IT services for a period up to 6 months

  5. Migration Goals • Create full production and development environments for all gas and power trading systems • Leave production capability (lesser strength) with the Estate

  6. Migration Considerations • Physical separation of applications • Data duplication • Data cleansing • Synchronization of integration points • Duplication of batch processes • Configuration changes (multicast addresses, server names) • Removal of hardcoded names • Testing

  7. Model Approach: EnronOnline • All production data copied to staging database and file system • Internet traffic routed through enron.com • Production, development, integration and testing environments to be migrated to NETCO • ISPs to be migrated to NETCO

  8. Mid – Back Office: Filling Hardware Gap • 2 Sun 6800 boxes • Additional disk space • New backup solution

  9. Global Systems Facilities Common Codes Counterparties Contracts Valuation and Risk Reporting Front-Office Risk Controls Credit Aggregation CPR EnPower RisktRAC Portcalc/Pwr Portcalc Interest Rates/FX TDS Infinity Rate Management EnronOnline TAGG LIM Phoenix MKM Sitara Deal Confirmation Document Management DCAF Livelink EDI Hub Back-Office EC Outlook Unify Ledger Treasury Workstation SAP

  10. Global Systems Facilities Common Codes Counterparties Contracts Valuation and Risk Reporting Front-Office Risk Controls Credit Aggregation CPR EnPower RisktRAC Portcalc/Pwr Portcalc Interest Rates/FX TDS Infinity Rate Management EnronOnline TAGG LIM Phoenix MKM Sitara Deal Confirmation Document Management DCAF Livelink EDI Hub Back-Office EC Outlook Unify Ledger Treasury Workstation SAP

More Related