Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance on Institutional Building for the Implementation of RCOP in Turkey. This project is co-financed by the European Union and the Republic of Turkey.
E N D
Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance on Institutional Building for the Implementation of RCOP in Turkey This project is co-financed by the European Union and the Republic of Turkey Advanced Training PRAG Works5 – 7 April 2011 Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Advanced Training PRAG Works 5-7 April 2011
Agenda - 1 This project is co-financed by the European Union and the Republic of Turkey • Day # 1 • Introduction • Roles of Parties • FIDIC & PRAG Integration • Contract Types • Project Life Cycle for Tender & Contracting • Contents of a Works Tender Dossier • Where to find what • Expertise Necessary • 2 exercises/cases (morning + afternoon) Advanced Training PRAG Works 5-7 April 2011
Agenda - 2 This project is co-financed by the European Union and the Republic of Turkey • Day # 2 • Lots (if any) • Procurement Notice & ITT • Selection Criteria • Volume 3, 4 & 5 of a TD • (with a focus on FIDIC implementations) • Documents forming a Works Contract • Annex to Tender • Volume 2 contents • 2 exercises/cases (morning + afternoon) Advanced Training PRAG Works 5-7 April 2011
Agenda - 3 This project is co-financed by the European Union and the Republic of Turkey • Day # 3 • Tender Evaluation • Award Procedures • Exercise # 5 • Other Relevant Info • Suspension Clause • Additional Works • Variant Solutions • Modifying of works contracts • Rules of Origin • Supervision ToRs • Overall evaluation of the training Advanced Training PRAG Works 5-7 April 2011
Agenda This project is co-financed by the European Union and the Republic of Turkey • Session # 1 • Day # 1 - Morning • Introductions • Roles of Parties • PRAG & FIDIC Integration • Contract Types • Project Life Cycle • Sequence of Events • Exercise # 1 on Planning Advanced Training PRAG Works 5-7 April 2011
Introduction - 1 This project is co-financed by the European Union and the Republic of Turkey • Trainer: • Kerem Sadıklar • Civil Engineer & MBA • > 15 years of experience including EU & UNDP • kerem.sadiklar@grontmij.com.tr • Participants: • 25 of FCD + TID of RCOP – CIC • Knowledge & experience level? Advanced Training PRAG Works 5-7 April 2011
Introduction - 2 This project is co-financed by the European Union and the Republic of Turkey • Training Objectives: • By the end of the course, the trainees should; • have a solid understanding of Contract Types • know contents of a tender dossier • know where to find what • be able to identify the external expertise they need • be able to identify selection criteria, be able to draft PN and ITT • Be able to attend an evaluation committee as an evaluator (votingmember) Advanced Training PRAG Works 5-7 April 2011
Introduction - 3 This project is co-financed by the European Union and the Republic of Turkey • Training : • will be interactive; please be participative • will use exercises • will involve team work • will use internet (EC sites) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PRAG Works - 1 • Roles of Parties • Decentralised: Ex-Ante • EUD ( Ex-ante approval & Observor & Monitoring) • CFCU ( Contracting Authority & Employer & Final Beneficiary) • MoIT (Operational Structure) • End Recepients • Contractor(s) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PRAG Works - 2 • PRAG & FIDIC integration • PRAG; Practical Guide to Contract Procedures for EU ExternalActions • FIDIC; conditions of contract • FIDIC replaces/changes certain documents of PRAG, but • Mainly they complement each other. • It is important to understand what each stands for in practice… Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Works Contracts • Work Contract Types by nature • Construction (Employer’s Design FIDIC RED BOOK) • Plant and Design – Build (FIDIC YELLOW BOOK) • Design Build Operate • (FIDIC YELLOW BOOK) • (FIDIC GOLD BOOK – still not finalized) • EPC (Engineer Procure Construct) /Turnkey Projects (FIDIC SILVER BOOK) Advanced Training PRAG Works 5-7 April 2011
Contract Types - 1 This project is co-financed by the European Union and the Republic of Turkey Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contract Types - 2 • Single Tender • ≤ € 10.000 • PRAG 2.4.8 defines the procedures • Single tenderer is sufficient • Basic principles should be met (eligibility rules, capacity, exclusion criteria, etc.) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contract Types - 3 • Competitive Negotiated Procedure • 3 contractors are invited (InvitationLetter + Tender Dossier) • 30 days for submission of proposals • Tenders are evaluated by a committee of 3 • 1 compliant tender is sufficient to award • After 2 successive failures CA may proceed with negotiated procedure • Subject to prior approval of the EC Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contract Types - 4 • Local Open Tenders • No forecast notice • Not published on the OJ of EC but on the OJ of the Beneficiary Country or equivalent media • PN must also be published on the Europeaid website • Give 15 days for translation • Equal opportunities for the eligible contractors located outside the Beneficiary Country Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contract Types - 5 • International Open Tenders • FN must be published on the Europeaid website • Give 15 days for translation • PN must be published in OJ of EC and on the OJ of the Beneficiary Country or equivalent media • PN must also be published on the Europeaid website • Give 15 days for translation Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Sequence of Events - 1 • Time planning is crucial for successful tendering & contracting • Supervision and Work Tenders have to run in parallel; • Relevant contracts should be signed after securing the other, • Supervision contract should commence before the relevant works contract (ideally1 month) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Sequence of Events - 2 Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Sequence of Events - 3 • Project Life Cycle (after contracting): • Access to site • Commence Order (90 days after contract signature) • Execution Period (depends on each project) • Defects Liability Period (12 months) • The project duration in an OIS and the duration of the relevant supervision contract should take these into account… Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey • Exercise # 1 • Please prepare a time schedule for the tendering and contracting of the works and supervision components of a construction project. • The schedule should include all the relevant milestones. • Please do a joint schedule for both types of the works contracts (local and international open tenders). Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Agenda • Session # 2 • Day # 1 - Afternoon • Where to find what? • Contents of a Works Tender Dossier • Expertise Necessary vs. Project Type • Exercise # 2 (Contents of a Works TD) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey EC Web Sites • An important thing to know; Where to find what? • Starting point for EuropeAid; • http://ec.europa.eu/europeaid/index_en.htm • PRAG documents; • http://ec.europa.eu/europeaid/work/procedures/implementation/index_en.htm • All tenders; • https://webgate.ec.europa.eu/europeaid/online-services/index.cfm?do=publi.welcome • PRAG is a living document; please get accustomed to use these sites… Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contents of a TD - 1 • A works tender dossier consists of 5 Volumes • Volume 1 (ITT& forms) • Volume 2 (Contract & Samples) • Volume 3 (Technical Specifications) • Volume 4 (Financial Offer) • Volume 5 (Drawings) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contents of a TD - 2 • Volume 1: • ITT (Instructions to Tenderers) • Tender Forms • Tender Guarantee Sample • Questionnaires • LIF & FIF • PoA • Financial Statements • Evaluation Grids • The tenderer’s proposal will be a part of the contract documents but Volume 1 and PN will not … Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contents of a TD - 3 • Volume 2: • Draft Contract • General (FIDIC Book Cover Page) & Particular Conditions • Security Samples (Pre-finance, Performance & Retention) • Annex I (Taxcustomsarrangements) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contents of a TD - 4 • Volume 2: • FIDIC & PRAG; changes please be careful • Security Samples (Pre-finance, Performance & Retention) • Under FIDIC Performance Guarantee reads as; • « …. We note that the guarantee will be released in accordance with Article 4.2 of the Particular Conditions to the Contract [ and in any case at the latest on (at the expiry of 18 months after the implementation period of the Contract) ]. …» • Under EU General Conditions Performance Guarantee reads as; • « ..We note that the guarantee will be released in accordance with Article 15.8 of the General Conditions to the Contract [and in any case at the latest on (at the expiry of 18 months after the implementation period of the Contract)]..» Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Contents of a TD - 5 • Volume 3: • Technical Specifications • Volume 4: • Model Financial Bid & Payment Preambles • Volume 5: • Design Documents & Drawings Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Expertise Necessary - 1 • Various types of experts are necessary to prepare a full-fledged Works TDs • For infrastructure projects: Environment (water & waster water), • Transportation etc. • Design Engineers • Environmental Engineers • Quantity Surveyors • CAD Experts • Contract Experts • Tendering and PRAG experts • Usually executed under Design-Build (Yellow FIDIC) Contracts with the exception of water, waste water networks… Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Expertise Necessary - 2 • Various types of experts are necessary to prepare a full-fledged Works TDs • For superstructure projects: Buildings, etc. • Architects • Design Engineers (Structural, Mechanical, Electrical) • Quantity Surveyors • CAD Experts • Contract Experts • Tendering and PRAG experts • Usually executed under Employer’s Design (RED FIDIC) Contracts Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Expertise Necessary - 3 • Phases of Preparation of a Works Tender Dossier (RED FIDIC BOOK) - 1 • Meetings with End Users and Suppliers • Preparation of the Design Concept / Note • Alternative Conceptual Designs (2 to 3) • Presentation and discussion on conceptual designs • Revisions and approval of the conceptual design • Engineering calculations Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Expertise Necessary - 4 • Phases of Preparation of a Works Tender Dossier (RED FIDIC BOOK) - 2 • Detailed Execution Designs (Volume 5) • Technical Specifications (Volume 3) • Bill of Quantities & Financial Proposal (Volume 4) • Volume 1 & 2 Advanced Training PRAG Works 5-7 April 2011
Expertise Necessary - 5 This project is co-financed by the European Union and the Republic of Turkey • Please note that; • This is a team’s work • It is not simply a works tender dossier; • There is design of a building/facility from scratch • There are laws and regulations that have to be addressed • Design responsibility / indemnity insurance • It takes 5 months • Tender dossiers are prepared for unit price RED FIDIC contracts; necessary quality assurance tools have to be established… Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey • Exercise # 2 • Please use the below link to download all the contents of a works tender dossier. • http://ec.europa.eu/europeaid/work/procedures/implementation/index_en.htm Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Agenda • Session # 3 • Day # 2 - Morning • Lots • Instructions to Tenderers • Procurement Notice • Selection Criteria • Exercise # 3 (Procurement Notice) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 1 • Lots • When and why do we need them? • Not for artificial splits to lower thresholds and shorten tendering periods • To secure contracting • To ease implementation (fewer contracts areeasier to manage) • To assign appropriate contractors • To have a sector focused approach • Supervision contract(s) should also be assessed accordingly Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 2 • ITT (Instructions to Tenderers) – 1 • Financing • Participation • Information to be supplied by the Tenderer • Site Inspection / Clarification meeting • Law • Content and presentation of tender • Tender prices – currency of tender and payment Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 3 • ITT (Instructions to Tenderers) – 2 • Period of validity of tenders • Tender Guarantee • Variant Solutions • Submission of Tenders • Opening and evaluation of tenders • Contract award – performance guarantee • Commencement of works • Appeals Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 4 • Tender Guarantee; 1% - 2% of the estimated budget • Selection Criteria • Financial; no more than last 3 years • Technical; no more than last 5 years Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 5 • Economic and Financial Standing (Financial Criteria) - 1 • «Annual Turnover (the amount of business done in a year, incomes generated from ongoing works and incomes generated from works undertaken as Joint Venture shall be considered as part of the turnover): • The average annual turnover in the last 3 (three) years XXXXX Euros» • For companies which were established within the last 3 (three) years but not less than 2 (two) years, only the average of the years since established will be taken into account which cannot be less than 2 (two) years…» Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 6 • Economic and Financial Standing (Financial Criteria) - 2 • Financial Resources « The Tenderer shall demonstrate, by a bank statement from his/her bank, that s/he has available or has access to liquid assets, lines of credit or other financial means sufficient to meet the construction cash flow for the contract of not less than; xxxxx Euro» • Financial Position «The Audited Financial Statements or loss and profit statements for the last 3 years shall be submitted and must demonstrate the soundness of the applicant’s financial position, showing long-term profitability. The tenderer should be in positive profit account at least 2 of the last 3 years Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 7 Technical and Professional Capacity - 1 Similar Works Experience: «The tenderer, tendering for each lot should have completed similar projects within the last five years (provisional acceptance certificate should have been issued within the last five years; i.e. XXX up to date of this tender) as defined below: Experience as prime contractor in the execution of: At least one building construction project (e.g.Xxxxx)» Advanced Training PRAG Works 5-7 April 2011
PN & ITT - 8 This project is co-financed by the European Union and the Republic of Turkey • Technical and Professional Capacity - 2 • KeyPersonnel: • LigitationHistory Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey PN & ITT - 9 • Selection Criteria • In supplies & services: the criteria are applied to the consortium as a whole • In works: each member needs to fulfill a minimum percentage of the criteria • Proof documents have to be provided Advanced Training PRAG Works 5-7 April 2011
PN & ITT - 10 This project is co-financed by the European Union and the Republic of Turkey • Selection Criteria • Please use reasonable and necessary criteria • The technical forms should be in line with the absolute necessities of the project • Try to avoid; • unfair competition • risking the award of the contract • Award Criteria • Price for works (satisfying the conditions) Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey • Exercise # 3 • Please use the below link to download and prepare a PN for a construction project. Please assume the following for the exercise; • An administrative building with an indoors are of 5,000 m2 will be constructed, • The construction period is 12 months, • The estimated construction budget is 6,500,000 Euros • http://ec.europa.eu/europeaid/work/procedures/implementation/index_en.htm Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Agenda • Session # 4 • Day # 2 - Afternoon • Volume 3, 4 and 5 of a Works TD • Documents forming a Contract • Exercise # 4 (Financial Offer and Contract Price) Advanced Training PRAG Works 5-7 April 2011
Volume 3 - 1 This project is co-financed by the European Union and the Republic of Turkey • General Specifications • For each work item • (Civil/Structural, Architectural, Electrical, Mechanical) • Technical Specifications • Item Descriptions • Location forms • Standards and Codes Advanced Training PRAG Works 5-7 April 2011
Volume 3 - 2 This project is co-financed by the European Union and the Republic of Turkey • In order to secure fair competition; • Local item codes should not be used, • A unique coding system should be established, • Proper English level should be reached in technical specifications, • Creating unfair advantage to certain tenderers should be avoided Advanced Training PRAG Works 5-7 April 2011
This project is co-financed by the European Union and the Republic of Turkey Volume 4 – 1 • Volume 4, Financial Offer • Lump Sum • 4.2.1 – Introduction • 4.2.2 – Recapitulation • 4.2.3 - Breakdown of the Lump-sum Price • 4.2.4 – Daywork Schedule • 4.2.5 – Detailed Breakdown of Prices Advanced Training PRAG Works 5-7 April 2011