130 likes | 448 Views
Main Street (US 276) Enhancement Project March 2010 Northern Gateway Proposed Improvements Landscaped medians north and south of Forrester Drive Landscaped island at Forrester Drive Sidewalk from ICAR south to near CF Sauer property
E N D
Main Street (US 276) Enhancement Project March 2010
Northern Gateway Proposed Improvements • Landscaped medians north and south of Forrester Drive • Landscaped island at Forrester Drive • Sidewalk from ICAR south to near CF Sauer property • Large Trees at gateway sign and on north side of Forrester Drive
Murray Drive Area Proposed Improvements • Sidewalk in front of Kellett’s Corner • Remove overhead utility wires from Mauldin Deli to Knollwood Drive • New landscaping beds in the right of way on both sides of Main Street, mixture of trees, shrubs and perennial flowers
City Center Proposed Improvements • Decorative streetlamps with banners • Landscaping where right-of-way is wide enough for planting
Southern Gateway Proposed Improvements • Landscape existing grass median, small trees and perennial flowering plants • Landscaping between frontage road and US 276, mixture of trees • Large grouping of mixed trees in islands between US 276 and SC 417 (mirrors large grouping of trees at Northern Gateway)