1 / 3

$1,034,541,312 Adjusted Plant in Service

2007 Allocation of Account 376 Distribution Mains Dockets UE-072300 and UG-072301. $1,034,541,312 Adjusted Plant in Service. 67% Peak $693,581,376. 33% Average $340,959,936 Allocated to all classes on annual throughput (minimum throughput for Schedules 85, 87, 57 and Special Contracts).

Download Presentation

$1,034,541,312 Adjusted Plant in Service

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2007 Allocation of Account 376 Distribution Mains Dockets UE-072300 and UG-072301 $1,034,541,312 Adjusted Plant in Service 67% Peak $693,581,376 33% Average $340,959,936 Allocated to all classes on annual throughput (minimum throughput for Schedules 85, 87, 57 and Special Contracts) Direct assignment to Schedules 85, 87, 57 and Special Contracts $11,121,044 Allocated to Schedules 16, 23, 53, 31, 41, 86, and 50 on peak $682,460,332

  2. 2004 Allocation of Account 376 Distribution Mains Dockets UG-040640 and UE-040641 $685,004,545 Adjusted Plant in Service Direct assignment to Schedules 85, 87, 57 and Special Contracts $50,894,933 Average day February 2003 41° F Allocated Portion to Schedules 23, 31, 36, 51 and 86 $634,109,612 60% Peak $380,465,767 40% Average $253,643,845

  3. 2006 Allocation of Account 376 Distribution Mains Dockets UE-060266 and UG-060267 $782,343,897 Adjusted Plant in Service Direct assignment to Schedules 85, 87, 57 and Special Contracts $2,746,889 Limited to only stretches of pipe that served a single customer. No shared main was included. Small (Less than 4” diameter) Schedules 23, 31, 36, 51, 50, 41 and 86 $419,843,768 Large (Greater than or equal to 4” diameter) Allocated to all classes $359,753,240 33% Average $138,548,443 67% Peak $281,295,325 33% Average $118,718,569 67% Peak $241,034,671

More Related