Yolanda Recovery and Rehabilitation Plan

Yolanda Recovery and Rehabilitation Plan. Immediate Interventions. November 27, 2013. Rapid Start-Up Initiatives. Resettlement and Housing.

Download Presentation

Yolanda Recovery and Rehabilitation Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Yolanda Recovery and Rehabilitation Plan Immediate Interventions November 27, 2013

  2. Rapid Start-Up Initiatives

  3. Resettlement and Housing • Resettle affected families previously living in “no build” zones  Construction of temporary housing (bunkhouses) of P150,000 for 315,000 families = P47.3B • Rebuilding houses of affected families in “ok to build” areas  Housing grant of P30,000 for 218,958 families = P6.6B • Repair damaged houses of affected families in “ok to build” areas  Housing materials assistance (NHA model) of P10,000 for 551,674 families = P5.5B

  4. Critical Public Infrastructure • Roads, bridges, flood control, public buildings (DPWH) = P1.0B • LGU infrastructure – local roads clearing, water supply, municipal halls, police/fire station, public markets, health facilities, multi-purpose (DPWH, DILG) = P10.9B • Water supply (LWUA) = P0.2B • Power transmission and distribution = P5.9B • Ports, airports, LGU ports, coast guard, LTO, LTFRB (DOTC, PPA, CAAP) = P0.8B

  5. Re-establishing and Scaling Up Social Services

  6. Restarting Agriculture • Immediate – Total = P4.6B • Clearing operations = P0.4B • Fuel subsidy = P0.1B • Farm tools = P0.1B • Seeds (rice, corn) = P0.1B • Coconut rehabilitation = P1.8B • Banca and fishing paraphernalia = P2.2B • Medium to long-term = P2.3B • Coconut rehabilitation = P2.0B • Irrigation (NIA) = P0.3B

  7. Short-term Employment Opportunities • Cash for work programs • DOLE = P0.1B • DSWD = P7.2B • Livelihood programs • DOLE = P0.09B • DSWD (Sustainable livelihood program) = P2.9B

  8. Re-establishing Private Assets • Expand access to finance to recapitalize enterprises in affected areas: • GFIs – Land Bank, DBP • Microfinance institutions – one-off subsidies for loan restructuring and micro-loans • Limited government guarantees to private banks

  9. Restoring LGU Operations • Options for enhanced LGU response and participation based on a supportive, performance-based framework • Offer and provide range of support to LGUs (technical assistance, grants, loans) • NGA-LGU “post-disaster recovery and rehabilitation compacts” with targeted LGUs

  10. Tapering Relief • Relief Operations for next three months (DSWD) = P30.3B • Relief will become increasingly focused on people from areas that were catastrophically or severely affected • in situ, displaced within home LGU • migrants (temporary/permanent) • Moderately affected areas will tend to recover with a natural decline in the need for relief

  11. Preliminary Indicative Estimate of Total Budget Requirements for Yolanda Recovery and Rehabilitation