1 / 19

North American Strategic Infrastructure Leadership Forum October 12, 2011

North American Strategic Infrastructure Leadership Forum October 12, 2011. Russell Stidolph Chief Financial Officer (203) 299-5420 rstidolph@tresamigasllc.com. Tres Amigas – Overview . Project Value Creation. The Location: Regional Renewable Resource Potential.

bess
Download Presentation

North American Strategic Infrastructure Leadership Forum October 12, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North American Strategic Infrastructure Leadership ForumOctober 12, 2011

  2. Russell Stidolph Chief Financial Officer (203) 299-5420 rstidolph@tresamigasllc.com CONFIDENTIAL & PROPRIETARY

  3. Tres Amigas – Overview

  4. Project Value Creation

  5. The Location: Regional Renewable Resource Potential Significant Regional Wind & Solar Capacity Factors in Excess of 35% Source: NREL

  6. From the 2010 Transmission Summit in Sweetwater w/ HVDC Proposals

  7. Site Location in New Mexico

  8. Design

  9. TresAmigas Layout • AC switchyard allows for AC line reconfiguration • DC Switchyard allows for HTS CONFIDENTIAL & PROPRIETARY

  10. TresAmigas Conceptual Build Out-Detail Approx. 2 km Expansion >5GW Full 5GW build out allows for high current DC bus

  11. Alstom Grid HVDC MaxSine Technology + V + V - V - V = chain link module • Voltage Sourced Converter (VSC) technology • Modular multi-level converter design • Control of real and reactive power flow into AC grids • Harmonic free output voltage • Ideal for use on weak AC grids • Compact station footprint VSC HVDC scheme CONFIDENTIAL & PROPRIETARY

  12. New Mexico Economic Impact: Ripple Effect Illustrates Ripple Effect if 6.0 GW of Wind Is Developed by 2015 Direct Impacts from 6.0 GW Landowner Revenue: Over $16.3M/year Construction Phase: 13,800 new jobs $2.6B to local economies Operational Phase (20yrs): 1,460 new long-term jobs $130M/year to local economies Indirect Impacts Construction Phase: 7,200 new jobs $818M to local economies Operational Phase: 380 new long-term lobs $39.2M/year to local economies Induced Impacts Construction Phase 8,600 new jobs $905M to local economies Operational Phase: 800 new long-term jobs $78.6M/year to local economies Source: CDEAC report

  13. Texas Economic Impact: Ripple Effect Illustrates Ripple Effect if 4.7 GW of Wind Is Developed by 2015 Direct Impacts from 4.7 GW Landowner Revenue: Over $12.9M/year Construction Phase: 10,900 new jobs $2.0B to local economies Operational Phase (20yrs): 1,150 new long-term jobs $103M/year to local economies Indirect Impacts Construction Phase: 5,700 new jobs $645M to local economies Operational Phase: 300 new long-term lobs $30.9M/year to local economies Induced Impacts Construction Phase 6,800 new jobs $714M to local economies Operational Phase: 630 new long-term jobs $62.0M/year to local economies Source: CDEAC report

  14. Economics Drive Phased Construction Phase 1: SPP-> WECC WECC-> SPP

  15. Economics Drive Phased Construction Phase 2: 750 MW SPP  ERCOT ERCOTSPP

  16. Economics Drive Phased Construction Phase 3: 750 MW WECCERCOT ERCOT WECC

  17. Economics Drive Phased Construction Phase 4: Additional 2GW SPP  ERCOT ERCOTSPP 2 GW

  18. Current Projected Build out Timeline

  19. Strategic Partners and Vendors Foundation Fuel