1 / 6

Future Meetings for TSG-S

Future Meetings for TSG-S. TSG-S Chair Nick Yamasaki (KDDI) tsgs_chair@3gpp2.org 13 September 2011. Status of Work in 3GPP2. The major fields of standardization in 3GPP2, as defined in 3GPP2 Future Workshop held in Osaka in 2008, are: 1x Enhancement HRPD Enhancement

bette
Download Presentation

Future Meetings for TSG-S

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future Meetings for TSG-S TSG-S Chair Nick Yamasaki (KDDI) tsgs_chair@3gpp2.org 13 September 2011

  2. Status of Work in 3GPP2 • The major fields of standardization in 3GPP2, as defined in 3GPP2 Future Workshop held in Osaka in 2008, are: • 1x Enhancement • HRPD Enhancement • Interworking with Non-3GPP2 systems • Femto Cells Most of these items are either substantially complete or in Stage 2/Stage 3 development. Once current TSG-S items in development (e.g., S.P0139 Femtocell System Overview) are complete, there will be very little additional work on requirements or security. • Now 3GPP2 embarks on its next phase of activities.

  3. Status of Work in TSG-S • Documents published this year: • S.R0139-0 v1.0 Femtocell and Picocell System Overview • S.R0144-0 1x Calling Party Number Presentation (CPNP) during e1xCSFB Stage 1 Requirements • S.S0145-0 Advanced Security Framework for HRPD and eHRPD Systems • Requirements development in process • M2M SRD • RAN Power Mgmt SRD • Femtocell/picocell SRD • USSD SRD • Downloadable Credentials (eUICC) • Femto and M2M Impact must be considered wrt 3GPP2 NAM • PMT activities are on-going, primarily based on monthly conference calls. • Security issues need to be investigated wrt M2M and Downloadable credentials. • Other WIs may be issued in the future (e.g., SON).

  4. Chair’s Assessment of Future TSG-S Work • WG1: Requirements work will decrease substantially in 2012. Much of the development work can be successfully progressed using GTM tool. However, joint TSG sessions at face-to-face meetings are important. • WG2: Recent technical work has been conducted in conjunction with other TSGs, especially TSG-X. Recent WG2 specific meetings have been mostly for admin and editorial processing. • WG3: Number of new WIs will decrease substantially in 2012 and process documents will become stable. Monthly GTM calls have been very successful in progressing work. • WG4: Participation has been minimal. Based on low participation, technical development using GTM is viable.

  5. TSG-S Meetings for 2012 and Beyond • TSG-S will not meet at the following face-to-face meetings. These meetings will be replaced with WG and Plenary conference calls: • February 2012 China • August 2012 USA • For meetings where TSG S will not meet face-to-face, TSG-S Plenaries conference calls (GTM sessions) will be scheduled via GTM at the same time locally for the venue as the TSG-S opening and closing Plenaries are normally scheduled. • RECOMMENDATION: Joint meetings at these face-to-face sessions should be scheduled as follows (to maximize global participation remotely via GTM sessions): • Asia face-to-face venue 8-10 AM venue time • US east coast face-to-face venue 8-10 AM venue time • US central (Chicago) face-to-face venue 8-10 AM venue time • US west coast face-to-face venue 5-7 PM venue time • Some TSG-S WGs may consider monthly conference call schedules similar to current PMT interim conference calls.

  6. 3GPP2 Meeting Plan for 2012 • 6-9 Feb 2012 China • 16-19 Apr 2012 Probably Chicago (SC/OP meeting will be 23 Apr 2012) • 11-14 Jun 2012 Korea • 6-9 Aug 2012 Target USA but MPT may cancel this meeting • 15-19 Oct 2012 Japan (SC/OP meeting will be 22 Oct 2012) • 10-13 Dec 2012 Maui, HI

More Related