An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Impacts on Hong Kong Observed Climate Changes in Hong Kong from the last century to 2009

  2. Group 3 • 1st priority: need Policy Framework (not just the loose elements in typical of policy address), to include requirement to • Review legislation, e.g. BO, B(EE)R, EIAO, Mandatory BEC, TPO-OZP • Review related codes and practices, e.g. OTTV Code, AVA acceptance criteria, AVA extend to private development • Which departments to review? • BD, PlanD, LD (DNB) • Should include public consultation during review

  3. Group 5 • Need to review • Drainage design manual • Port works manual • Relevant structural design guidelines • How • Departments • Implementation • Will need to rely on risk assessment to develop various options of risk exposure for decision making (by consultancy work) • Short term (say 2015) • Look at

  4. drainage design • Materials (Noise, etc.) • Dept, TD, etc. • May need consulting study • The updates need to be reflected in the standards

  5. Need to implement from planning stage (beginning) • E.g. similar to preliminary strategic IA • Need expertise to use tool, to assess potential technical impacts,

  6. observations • Brainstorming starting from technical details and flowing back up to the ordinance level • What are the numbers we need for design? We don’t know…