1 / 26

James D. McClure, P.E. Estes, McClure & Associates, Inc. Engineering and Consulting 3608 West Way St. Tyler, Texas 7

ROLE OF ENGINEER IN SCHOOL DESIGN & CONSTRUCTION. James D. McClure, P.E. Estes, McClure & Associates, Inc. Engineering and Consulting 3608 West Way St. Tyler, Texas 75703. SUCCESSFUL SCHOOL DESIGN & CONSTRUCTION:. “IT’S A TEAM PROCESS” “NO TEAM MEMBER SHOULD STAND ALONE OR BE ISOLATED”

bettina
Download Presentation

James D. McClure, P.E. Estes, McClure & Associates, Inc. Engineering and Consulting 3608 West Way St. Tyler, Texas 7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ROLE OF ENGINEER IN SCHOOL DESIGN & CONSTRUCTION James D. McClure, P.E. Estes, McClure & Associates, Inc. Engineering and Consulting 3608 West Way St. Tyler, Texas 75703

  2. SUCCESSFUL SCHOOL DESIGN & CONSTRUCTION: “IT’S A TEAM PROCESS” “NO TEAM MEMBER SHOULD STAND ALONE OR BE ISOLATED” “INTEGRATED DESIGN APPROACH” “INTEGRATED CONSTRUCTION APPROACH” Estes, McClure & Associates, Inc. Engineering and Consulting

  3. “THE TEAM”  COMMUNITY  OWNER/USER  ARCHITECT  ENGINEER  CONTRACTOR  SUB CONTRACTOR  TESTING Estes, McClure & Associates, Inc. Engineering and Consulting

  4. SCHOOL DISTRICT INCLUDE: • SCHOOL BOARD • ADMINISTRATION • EDUCATORS • FACILITIES • MAINTENANCE • INTEGRATED PEST MGT. • ENGERGY MANAGER • PURHCASING • ENVIRONMENTAL • SECURITY • TECHNOLOGY • KITCHEN • ATHLETICS • HEALTH Estes, McClure & Associates, Inc. Engineering and Consulting

  5. ENGINEERS IN SCHOOL DESIGN & CONSTRUCTION • MECHANICAL, ELECTRICAL, PLUMBING, ENERGY - HVAC - OPTIONS & OPPORTUNTIES - CONTROLS - MASTER PLANING - PLUMBING - ENERGY - ELECTRICAL POWER - SUSTAINABILITY - LIGHTING - ENERGY PROCUREMENT - TECHNOLOGY - STANDARDIZATION - COMMUNICATION PLANNING/PURCHASING - FIRE ALARM - TRAINING - SECURITY - DEVELOP GUIDELINES - DEVELOP OWNER REQUIREMENTS  CIVIL, STRUCTURAL Estes, McClure & Associates, Inc. Engineering and Consulting

  6. TEAM APPROACH INTEGRATED SCHOOL DESIGN & CONSTRUCTION ARICHITECT ENGINEER OWNER USER CONTRACTOR TESTING SUBCONTRACTORS • KITCHEN • LANDSCAPE • ACOUSTICS • ETC OTHER CONSULTANTS & SPECIALISTS “Continuous Communication Process” Estes, McClure & Associates, Inc. Engineering and Consulting

  7. SCHOOL DESIGN CONSTRUCTION PROCESS • PROFESSIONAL TEAM SELECTION • SELECTION CONSTRUCTION MANAGER • MASTER PLANNING/NEEDS ASSESSMENT • BOND ELECTION OR FUNDING METHOD • EDUCATIONAL PROGRAMMING • SCHEMATIC DESIGN • DESIGN DEVELOPMENT • CONSTRUCTION DOCUMENTS & ADDENDUMS • PRE-BID CONFERENCE • BIDDING & NEGOTATING • CONSTRUCTION CONTRACT AWARD • PRE-CONSTRUCTION MEETINGS Estes, McClure & Associates, Inc. Engineering and Consulting

  8. SCHOOL DESIGN CONSTRUCTION PROCESS • SUBMITTALS/SHOP DRAWINGS • CONSTRUCTION • REQUESTS FOR INFORMATION • SUBUSTITUTIONS • CHANGE ORDERS • ON-SITE OBSERVATIONS • TESTING, COMMISSIONING • SUBSTANTIAL COMPLETION • FINAL COMPLETION • CLOSE OUT DOCUMENTATION • O&M MANUALS Estes, McClure & Associates, Inc. Engineering and Consulting

  9. HELPFUL HINTS & EXAMPLES“TIMING OF INFORMATION & WORK EXCHANGE” • OWNER REQUIREMENTS • OPTIONS & OPPORTUNITIES • ENERGY EVALUATIONS ANALYSIS • SELECT TYPE HVAC SYSTEM • REFRIGERANT TYPE • LOCATION & SIZE OF MAJOR EQUIPMENT • LOCATION & SIZE OF MECHANICAL ROOMS • ELECTRICAL ROOM LOCATIONS & SIZE • MECHANCIAL CHASES • PLUMBING CHASES & WALL THICKNESS • WEIGHTS OF MEP EQUIPMENT • ACCESS REQUIREMENTS OF MEPT EQUIPMENT Estes, McClure & Associates, Inc. Engineering and Consulting

  10. HELPFUL HINTS & EXAMPLES“TIMING OF INFORMATION & WORK EXCHANGE” • CLEARANCE REQUIREMENTS - Electrical Equipment - Duct Work - Mechanical Equipment - Water Heater, Boilers • IPM - Sealing Penetrations - Water Leaks (Cooling Towers, Etc.) - Seal Holes for Computer/Technology Wiring - Light Sources & Types - Cover Fan & Vent Openings (Wire Mesh) • LOCATING EXISTING UTILITIES (Gas, Water, Sewer, Electricity, Others) Estes, McClure & Associates, Inc. Engineering and Consulting

  11. HELPFUL HINTS & EXAMPLES“TIMING OF INFORMATION & WORK EXCHANGE” • CEILING GRID LAYOUT (A/C Diffusers, Light Fixtures, etc.) • ROOF DRAIN LOCATIONS • CONTACT & COORDINATE UTILITY COMPANIES (Loads, Desired Service Entrances, etc.) • OWNER STANDARDIZATION REQUIREMENTS (HVAC, Switchgear, Fire Alarm Panels, Controls, etc.) • ELECTRICAL PROCUREMENT & COORDINATION • LOCATE HOODS, SINKS, COPIERS, COMPUTERS, PLUMBING FIXTURES, KILNS, SHOP EQUIPMENTS, SPRINKLER RISERS, SOUND EQUIPMENT, FIRE ALARM PANELS, MDF, IDF, TELEPHONE EQUIPMENT, ETC. • STRUCTURAL CLEARANCE COORDINATION • DOOR SWINGS & CABINETRY (Impacts Light Switches, etc.) Estes, McClure & Associates, Inc. Engineering and Consulting

  12. HELPFUL HINTS & EXAMPLES“TIMING OF INFORMATION & WORK EXCHANGE” • TECHNOLOGY & COMMUNICATIONS • LIGHTING SYSTEMS & CONTROLS • GAS LINES UP EXTERIOR WALLS • SIZE OF EQUIPMENT IN RELATION TO DOOR SIZES • CHASES FOR ROOF DRAIN DOWNSPOUTS • ADEQUATE SLOPE AVAILABLE FOR SEWER & STORM DRAIN • PIPING GRADE BEAM & PIERS LOCATION • ENERGY/SUSTAINABLE ITEMS Estes, McClure & Associates, Inc. Engineering and Consulting

  13. HELPFUL HINTS & EXAMPLESPREVENTION OF PROBLEMS & MAINTAINING ENERGY EFFICIENCY • SUBMITTALS (Check Closely) • SUBSTITUTIONS – VERIFY • Energy Efficiency • Performance • Size • Access • Voltage, Power • Noise/Sound Levels • Service Life • Materials Selection • Maintainability • ARCHITECT - If change door swings, tell MEPT Engineer - If relocate ceiling grid, or light fixture, tell MEP Engineer - Provide adequate wall thickness for plumbing chases & plumbing equipment support - Keep water & drainage away from building Estes, McClure & Associates, Inc. Engineering and Consulting

  14. HELPFUL HINTS & EXAMPLESPREVENTION OF PROBLEMS & MAINTAINING ENERGY EFFICIENCY • CLEARANCES COORDINATED If change building height tell MEP engineer. If change ceiling heights or type tell MEP engineer. • SLOPE OF SITE: WATER AWAY FROM BUILDING • CRAWL SPACE – DRAIN, VENTILATE • SEQUENCING OF WORK & BUILDING NOT CLOSED UP • CAP PIPES DURING CONSTRUCTION (PREVENTS F.O.D.) • DEVELOP HVAC & ENERGY CONTROL SEQUENCE, EARLY IN DESIGN • DO A SMOKE TEST OF PLUMBING Estes, McClure & Associates, Inc. Engineering and Consulting

  15. THE ROLE FOR MEPT ENGINEER • GETTING THE WORK • GENERAL PROJECT SCOPE, BUDGET, SCHEDULE • CONTRACT (ARCHITECT/OWNER) • MEET WITH ARCHITECT/OWNER • ATTEND EDUCATIONAL/SCHEMATIC PROGRAMMING ENERGY EVALUATIONS, OPTIONS • DESIGN DEVELOPMENT • CONSTRUCTION DOUCMENTS (Plans, Specifications) • BIDDING/PROPOSAL PHASE Estes, McClure & Associates, Inc. Engineering and Consulting

  16. THE ROLE FOR MEPT ENGINEER • CONSTRUCTION Pre Construction Conference Submittal Review RFI’s On Site Observations Coordination/Review T&B Substantial Completion Completion Close Out Documentation O&M Documents/Coordination • OCCUPANCY PERIOD - Energy Usage • Q&A • Electricity Procurement • Energy Management Assistance • TRAINING Estes, McClure & Associates, Inc. Engineering and Consulting

  17. CHARACTERISTICS OF ENERGY EFFICIENT SCHOOLS • Energy Efficiency Must Become One of the Primary Design Considerations • (Function, Form, Economy, Time, Energy, Sustainability) • Site and Orientation • Shapes and Sizes • Loads (Internal, Climate, Solar, Gain) • Color Selections • Daylighting • Building Envelope • Fuels & Energy Sources • Building Use Schedule • Housekeeping • HVAC Systems (Zoned, Right Sized, System Efficient, Flexible) • Energy Management Controls • Lighting (Flexible, Efficient, Controlled) • Kitchen Hoods (Short Circuit Type) • Testing and Balancing, Commissioning • Maintenance Capability and Budget • Owner Training • Monitoring & Tracking of Utility Usage & Cost Estes, McClure & Associates, Inc. Engineering and Consulting

  18. HOW SCHOOLS USE ENERGY Where Does All the Energy Go? Estes, McClure & Associates, Inc. Engineering and Consulting

  19. THE ROLE OF ENGINEER: AFTER CONSTRUCTION Energy Usage & Performance COST PERFORMANCE Elect $ + Natural Gas $ = $ Area of School ft²-yr ENERGY PERFORMANCE BTU ELECT + BTU NAT. GAS = BTU Area of School ft²-yr 1KWHR = 3413 BTU 1MCF = 1,030,000 BTU Estes, McClure & Associates, Inc. Engineering and Consulting

  20. THE ROLE OF ENGINEER: AFTER CONSTRUCTION • TRAINING • ENERGY MONITORING • ENERGY PROCUREMENT • ENERGY AUDITS • Q&A • UPDATING OF NEW TECHNOLOGY & OPPORTUNITIES • M&O ASSISTANCE • TROUBLESHOOTING • ENERGY AWARENESS & SUPPORT Estes, McClure & Associates, Inc. Engineering and Consulting

  21. IPM & MEP ENGINEER SECURE PANELS ACCESS Estes, McClure & Associates, Inc. Engineering and Consulting

  22. IPM & MEP ENGINEER REPAIR WATER LEAKS Estes, McClure & Associates, Inc. Engineering and Consulting

  23. IPM & MEP ENGINEER CONDUCT MASTER PLANNING SURVEYS ON-SITE Estes, McClure & Associates, Inc. Engineering and Consulting

  24. IPM & MEP ENGINEER • REDUCE SOURCES OF WATER • REDUCE MEANS OF ACCESS & TRAVEL • SCREEN ALL AIR INTAKE & EXHAUST VENTS • SEAL ALL PIPE PENETRATIONS • SEAL ALL TECHNOLOGY WIRING PENETRATIONS • INSULATE TO PREVENT CONDENSATION • REPAIR PLUMBING LEAKS • LEVEL COOLING TOWERS • REPAIR LEAKS IN PIPES, VALVES, COOLING TOWERS • SECURE EQUIPMENT PENHOUSES Estes, McClure & Associates, Inc. Engineering and Consulting

  25. IPM & MEP ENGINEER • LIGHTING - Selection (intensity, uv output, shield) - Location - Decoy strategy - Control during twilight periods • SECURE PANELS ON HVAC EQUIPMENT • KEEP ROOF DRAINS & DOWN SPOUTS OPEN • NO STANDING WATER (Gutters, outside, under buildings, etc.) • KEEP LANDSCAPE & GRASS AWAY FROM HVAC EQUIPMENT • KEEP INDOOR PLANTS AWAY FROM RETURN AIR GRILLS • OPERATE EXHAUST FANS IN SHOWER AREAS (Keep condensation off walls) • KEEP MECHANICAL ROOMS CLEAN • AIR CURTAINS Estes, McClure & Associates, Inc. Engineering and Consulting

  26. THE ROLE OF ENGINEER IN SCHOOL CONSTRUCTION • BE INVOLVED EARLY • PROACTIVE TEAM MEMBER • LOOK OUT FOR OWNER/USER INTEREST • MAKE GOOD CHOICES • HONOR COMMITMENTS Thank You! Estes, McClure & Associates, Inc. Engineering and Consulting