@. Inventory equipments Initial estimates for infrastructure (not detailed) Brief study for each system in order to be integrated @ CERN. Emiliano. Erwin. F.Wenander. E.Piselli - E.Siesling. @. TSR Max Planck Institute Heidelberg. TSR@ISOLDE LOI endorsed Jan 2011
E N D
@ • Inventory equipments • Initial estimates for infrastructure (not detailed) • Brief study for each system in order to be integrated @ CERN Emiliano Erwin F.Wenander E.Piselli - E.Siesling
@ TSR Max Planck Institute Heidelberg TSR@ISOLDE LOI endorsed Jan 2011 TDR submitted Jan 2012 (K. Blaum, Y. Litvinov) CERN BE TSR Integration Study Mandate Aug 2012 E.Piselli - E.Siesling
@ • In Operation since 1988 • It performs atomic and molecular experiments • Circumference of 55m • It receive heavy ions up to 16MeV (Hie-Isolde energy will be 10MeV/u) E.Piselli - E.Siesling