M eeting 19.-20.02.2014

Framework service contract Lot 4 Project: CDDA in conformity with INSPIRE Project status and overview of main issues. M eeting 19.-20.02.2014. Darja Lihteneger. Project purpose.

betty
Download Presentation

M eeting 19.-20.02.2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Framework service contract Lot 4Project: CDDA in conformity with INSPIREProject status and overview of main issues Meeting 19.-20.02.2014 Darja Lihteneger

  2. Project purpose • To provide the CDDA European data sets in conformity with the INSPIRE Protected sites Simple application schema – a prototype! • To set-up a proper workflow for transformation • Knowledge and information transfer to Eionet for a harmonised data flow based on conformity with INSPIRE

  3. Project scope –transformation process / conformity with INSPIRE PS Countries’ contributions (data) CDDA data flow is not changed! CDDA data model INSPIRE PS data model Conceptual level Source data model Target data model Analysis and transformation: • Source (CDDA) and target (INSPIRE PS) data models • Matching table (mapping rules) • Transformation • Validation Process Data Published spatial data set in EEA data service (Shapefile) INSPIRE conformant GML file(s) Output data Input data Project scope

  4. Project Overview: 5 steps in CDDA – INSPIRE PS Simple applic.schema September – November 2013 Until February 2014 March - June 2014 Until end of May 2014 Done Current Tests with countries (national data transformation into INSPIRE PS)

  5. Expected from current stage of the project

  6. Current issues: Mapping, Transformation and validation, geometry! M – mapping T&V – transformation and validation (GML) G – geometry, CRS, extent

  7. Current issues – recent questions?