An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lean eManufacturing Bob Reary Director, Supply Chain Product Strategy

  2. Your ROI... From this session will be... • to see how the best of traditional ERP should be coupled with Lean Manufacturing for increased response, market share, and return-on-assets • to learn some of the basics of eManufacturing • to gain an understanding of the opportunities and challenges presented by the Next economy

  3. Historically, there has been a trade-off between • setup and carrying costs

  4. 2AS EOQ = IC It went something like this: “EOQ = the square root of twice annual requirements times setup cost divided by item standard cost times carry rate” source=APICS

  5. Early Manufacturing solutions were characterized by: Policies and practices of isolation (Sales-to-Planning- to-Materials Mgmt . . . . . . . . Poor record accuracies . . . . High costs . . . . Redundancies

  6. Station “A” Station “B” Station “C” Sched: 100 Compl: 90 Sched: 100 Compl: 50 Sched: 100 Compl: 10 - Job for 100 units - 3 Routing operations on the shop floor - Schedule for 100 is released to the floor into WIP For instance... Let’s count WIP!

  7. Station “A” Station “B” Station “C” Sched: 100 Compl: 90 Sched: 100 Compl: 50 Sched: 100 Compl: 10 - Job for 100 units - 3 Routing operations on the shop floor - Schedule for 100 is released to the floor into WIP 10 WIP count... by operation

  8. Station “A” Station “B” Station “C” Sched: 100 Compl: 90 Sched: 100 Compl: 50 Sched: 100 Compl: 10 - Job for 100 units - 3 Routing operations on the shop floor - Schedule for 100 is released to the floor into WIP 10 50 90 WIP count... by operation But, how can we have so many?

  9. Station “A” Station “B” Station “C” Sched: 100 Compl: 90 Sched: 100 Compl: 50 Sched: 100 Compl: 10 - Job for 100 units - 3 Routing operations on the shop floor - Schedule for 100 is released to the floor into WIP 10 Let’s look... at this again!

  10. Station “A” Station “B” Station “C” Sched: 100 Compl: 90 Sched: 100 Compl: 50 Sched: 100 Compl: 10 - Job for 100 units - 3 Routing operations on the shop floor - Schedule for 100 is released to the floor into WIP 10 40 We have to consider... what has moved on!

  11. Station “A” Station “B” Station “C” Sched: 100 Compl: 90 Sched: 100 Compl: 50 Sched: 100 Compl: 10 - Job for 100 units - 3 Routing operations on the shop floor - Schedule for 100 is released to the floor into WIP 10 40 40 So... here’s the count! But, where’s the other 10 units?

  12. Demand Forecast Corporate Master ProductionScheduling Available - to- Promise MRP CRP Plant Source/Make/Deliver Then came “ERP”... a formal solution • “dependent demand” concept • full accountability • planning and execution in synch • “What?” and “When?”

  13. The along came Dr. Taiichi Ohno and Shigeo Shingo! Why count WIP? Why have WIP in the first place?

  14. Philosophically: ERP said... • You need to reconcile assets to the balance sheet • You need tools for status and control; for coping; for buffering to solve problems • You need to schedule and re-schedule; to prioritize and re-prioritize …the desire to reconcileis insidious!!

  15. Philosophically: Ohno said... • “When production control is properly understood, inventory control is unnecessary!” • WIP is a target for problems to stick to… keep the target small!

  16. So the trade-off was improved on by JIT! the development of • Reduced inventories • Agile/Lean manufacturing • High throughput and efficiencies • Increased Stability and Quality

  17. It was founded on this math: “JIT means increased orderfrequency” source=Reary A Frequency = 2AS IC

  18. Toyota Production System founded on: • JIT (Kanban) • “Automation with a human touch” (Jidoka) • Smoothing (Heijunka)

  19. At the supermarket

  20. Pull System

  21. Tricks of the trade Grandpa's Wonder Pine Tar Soap 4.25 oz. bar

  22. So, why would Toyota buy an ERP package? • to gain Y2K compliance • to achieve lower IT costs through deployment of a common solution • adapt to constant change • proof-of-concept: facilitated by demonstrated success with “backoffice”

  23. Fremont, CA Cambridge, Ont. Princeton, IN Georgetown, KY Background TMMNA Vehicles

  24. Background Toyota Parts Manufacturing Delta, BC Long Beach, CA Buffalo, WV St. Louis, MO

  25. About Toyota In North America Worldwide Size 4th Largest 3rd Largest Number of Plants 10 55 in 26 Countries Employment 30 Thousand 183 Thousand Number of Models 7 N/A Investment $11 Billion $127.5 Billion Production 1999 1 Million Vehicles 4.6 Million Vehicles Sales 1999 1.65 Million Vehicles 4.6 Million Vehicles Background Facts & Figures (Based on 1999 Data)

  26. 1 0.8 Million Vehicles 0.6 0.4 0.2 0 87 91 95 99 North American Vehicle Production

  27. $10.0 $8.0 Billion $6.0 $4.0 $2.0 $0.0 87 91 95 99 North American Parts Purchases

  28. Service Parts Export Parts B2B Background

  29. So, what did Toyota do to make ERP TPS-friendly? • elimination of PO’s feeding assembly (logistics and replen signals are pre-established) • no production orders (control is built into the process) • no inventory functions (2-hour inventory!) Keep the target small!

  30. Where did ERP Kanban Planning Demand Planning add value? • Level-by-level production planning (proprietary) • to systematize Heijunka smoothing and capacity management • to drive planned replenishment signals • link Customer orders to production kanbans • electronic poka yokesaka “quality pictures”

  31. Other key differentiators of TPS: • Customer demand mgmt to offset legacy system minimal functionality • order process • parts shipping schedule to Customer • visibility of part production • emphasize TAKT, notorders • stability, not reaction

  32. But how about this “APS”??? Advanced Planning & Scheduling • Optimization of key “constraints” • PeopleSoft was a pioneer in this technology

  33. Supply Chain optimization By Constraints Capacity Inventory Delivery Cost

  34. PRO’s fast memory-resident modelling good at complex sequencing CON’s implementation too long and complex loading the model is a “setup” cost that impedes frequency Fast forward… some pro’s and con’s of APS

  35. So what?? Why does it matter? Let’s take stock... ERP was for accounting and provided a foundation TPS is the chain So how does APS fit in?

  36. TPS vs APS TPS founded on: • smoothing (averaging?) • stability The bus... APS founded on: • responsiveness • event-driven planning and the elevator!

  37. Then there was… Demand Flow Technology! • John Constanza Institute of Technology • Very similar to TPS • demand-driven execution • stable operations • stable patterns of supply

  38. TPS assumption of complex operations and transfer lines preference for overtime to meet demand fluctuations Demand Flow assumption of light assembly preference for line re-balancing to meet demand fluctuations TPS and Flow Costanza’s Quality Stick is aShingo Poka Yoke

  39. The attributes of … Solution soup! • Bom depth (DFT) • Levelling (TPS) • Sequencing (APS) • Release (OPT-we ignored this one!) • Event-driven (APS) • Record keeping and Capacity management (ERP)

  40. APS + TPS = FPS! Flow Production System

  41. Four-Wall Flow Turns are about 12/year

  42. No-Wall Flow Result: turns are now about 36/year!

  43. The key is cross-web sharing Planning simplification Collaborate by Rate

  44. So what? Taking stock: if you know you have to • respond to actual demand • keep your asset base low • use JIT principles • avoid unnecessary trade-off’s what should be your course of action? Then...

  45. Richness Reach A given: This trade-off...

  46. Richness Reach A given: … is exploding!

  47. And “reach” is driving commoditization! • law of 95-5 • high reach = high availability • high availability = low differentiability So the focus should be on the Supply web!

  48. From… The age of reason where success meant • improve on the operational trade-offs • improve quality, change-over • stabilize operations • reduce number of suppliers • tightly connect to large Customers • increase market share through cost improvement • search downward opportunities

  49. To… The age of “access” where success means • Search upward opportunities • leverage access • increase share through response to actual demand • keep flexibility at lowest point

  50. Flexibility... The wrong way! Yet another trade-off to solve!

More Related