Introduction. Scaffold is a necessary part of nearly every construction site it provides access egress and a safe working platform. Since various trades all use scaffold it is imperative that the scaffold is correctly erected maintained and signed off.. Scope. General erection requirementsSafe use of scaffoldsScaffold tagging proceduresInspection procedures.
E N D
1. Scaffold Appreciation Session 1
Scaffolding Overview
2. Introduction Scaffold is a necessary part of nearly every construction site it provides access egress and a safe working platform. Since various trades all use scaffold it is imperative that the scaffold is correctly erected maintained and signed off.
3. Scope General erection requirements
Safe use of scaffolds
Scaffold tagging procedures
Inspection procedures This Safety Awareness course will not produce people competent to erect scaffolds. It will give awareness regarding the safe use of scaffolds on Fab 14.This Safety Awareness course will not produce people competent to erect scaffolds. It will give awareness regarding the safe use of scaffolds on Fab 14.
4. General Erection Requirements Ground surface
Height restrictions
Guardrails / toe boards
Access For erections we will only look at the alloy system. As external vendors will be used for all other types as a greater degree of skill is required.For erections we will only look at the alloy system. As external vendors will be used for all other types as a greater degree of skill is required.
5. Ground Surface Ground surface must be level
Baseplates needed on all fixed scaffolds
Adjustable legs needed on uneven surfaces Towers should be erected and used only on ground suitable (i.e. concrete, tarmac or similar). When towers are on soft ground baseplates must be used and these must be provided with a firm foundation.
Erection commences with either castors or baseplates to four adjustable legs.
Castors should have brakes, be free running and have the SWL marked on them.
A locking device keeps the castors and baseplates connected to the adjustable legs.
The adjustable legs are fitted into the lower ends of the columns of two end frames and locked into position. Each leg has a device to vary its extension so the tower can be made level on uneven or stepped surfaces.Towers should be erected and used only on ground suitable (i.e. concrete, tarmac or similar). When towers are on soft ground baseplates must be used and these must be provided with a firm foundation.
Erection commences with either castors or baseplates to four adjustable legs.
Castors should have brakes, be free running and have the SWL marked on them.
A locking device keeps the castors and baseplates connected to the adjustable legs.
The adjustable legs are fitted into the lower ends of the columns of two end frames and locked into position. Each leg has a device to vary its extension so the tower can be made level on uneven or stepped surfaces.
6. Height Restrictions 3:1 height to base ratio for unsupported scaffold
Outriggers / stabilizers if exceed the 3:1 height
to base ratio
Tying in needed on fixed scaffold over 8 metres The base to height ratio on Fab 14 is 3 - 1, so for a tower with a 2m X 4 base dimension the achievable height is 6m.
A greater height can be achieved by the use of stabilisers / outriggers which increase base area.
Tying in of the tower is necessary when it reaches 12m in height.
Also the higher the scaffold extends the lower the weight bearing capabilities become.
The base to height ratio on Fab 14 is 3 - 1, so for a tower with a 2m X 4 base dimension the achievable height is 6m.
A greater height can be achieved by the use of stabilisers / outriggers which increase base area.
Tying in of the tower is necessary when it reaches 12m in height.
Also the higher the scaffold extends the lower the weight bearing capabilities become.
7. Guardrails Handrails 1000mm high approx.
Midrails 600 mm high approx.
Toe boards 150 mm high All scaffold towers on Fab 14 must have 100% fall protection, to achieve this requirement, handrails, midrails and toe boards are mandatory.
It is a serious offence to use a scaffold without 100% fall protection.All scaffold towers on Fab 14 must have 100% fall protection, to achieve this requirement, handrails, midrails and toe boards are mandatory.
It is a serious offence to use a scaffold without 100% fall protection.
8. Access Stair ladders
Inclined ladders
Stairway
Independent ladders
Rest platforms Access to the work platform can be by any of the above.
Vertical ladders which are incorporated into the end frames.
Inclination Width
Stair ladders 35 - 55 deg 280 mm
Inclined Ladder 60 - 75 deg 280 mm
Stairway 35 - 55 deg 400 mm
External ladders must never be used.
Independent ladders only when designed specifically.
Rest platforms must be provided every 4 m.
Stairways can be used as a means of access for tools and materials as long as one hand is used for a climbing hold.
Access to the work platform can be by any of the above.
Vertical ladders which are incorporated into the end frames.
Inclination Width
Stair ladders 35 - 55 deg 280 mm
Inclined Ladder 60 - 75 deg 280 mm
Stairway 35 - 55 deg 400 mm
External ladders must never be used.
Independent ladders only when designed specifically.
Rest platforms must be provided every 4 m.
Stairways can be used as a means of access for tools and materials as long as one hand is used for a climbing hold.
9. Safe Use of Scaffolds Stability
Safe loading
Moving towers
Fall protection There are 4 conditions which effect the safe use of scaffold towers.
The main reason for selection of alloy over different systems is its lightness and ease of assembly. The lightness of the structure means that care has to be taken to ensure the stability of the tower. The manufactures manual will show the safe height to which various configurations can be erected.There are 4 conditions which effect the safe use of scaffold towers.
The main reason for selection of alloy over different systems is its lightness and ease of assembly. The lightness of the structure means that care has to be taken to ensure the stability of the tower. The manufactures manual will show the safe height to which various configurations can be erected.
10. Stability Height calculations
Wind
Other horizontal loads
Vertical loads
Height calculations enter the equations of stability and must be looked in the _______________ of the work requirements of the tower.
On external towers, wind is a major player in the safe use of scaffolds. On no account must sheeting or any wind break be used on a tower. Be careful of the funnelling effect of wind in an unfinished building. Other horizontal loads are the forces exerted from the tower to an outside structure such as using the tower as a drilling platform or moving the tower from the work platform by pulling on pipe, ect.
Vertical loads are the operatives and materials on the platforms, do not exceed the SWL of each platform. It is recommended that stabilizers be used always no matter what height is required. If the scaffold is stationary for long periods of time, it must be tied to a secure structure. Scaffold hoists must be used in conjunction with an alloy tower.Height calculations enter the equations of stability and must be looked in the _______________ of the work requirements of the tower.
On external towers, wind is a major player in the safe use of scaffolds. On no account must sheeting or any wind break be used on a tower. Be careful of the funnelling effect of wind in an unfinished building. Other horizontal loads are the forces exerted from the tower to an outside structure such as using the tower as a drilling platform or moving the tower from the work platform by pulling on pipe, ect.
Vertical loads are the operatives and materials on the platforms, do not exceed the SWL of each platform. It is recommended that stabilizers be used always no matter what height is required. If the scaffold is stationary for long periods of time, it must be tied to a secure structure. Scaffold hoists must be used in conjunction with an alloy tower.
11. Safe Loading Scaffold capacity
Number of decks
Tools and personnel
Manufacturers guidelines Before ordering your scaffold tower, check your loading requirements, tools, and operatives. Determine the number of decks required. When ordering, tell the supplier your requirements regarding height, capacity and seek a copy of the manufacturers guidelines regarding erection which you are ____________ to use.Before ordering your scaffold tower, check your loading requirements, tools, and operatives. Determine the number of decks required. When ordering, tell the supplier your requirements regarding height, capacity and seek a copy of the manufacturers guidelines regarding erection which you are ____________ to use.
12. Typical Loads
13. Moving Towers, Basic Precautions Unload tower
No powered vehicles
Careful in wind
Overhead cables / obstructions
Outriggers / stabilizers
Check route prior to move When moving your tower unload your platforms.
Do not use a vehicle to either push or pull a tower.
Be careful with a high towers in windy conditions.
Check for powerlines or other obstruction.
Before movement, unlock all casters, raise stabilisers and check the route for drains, inclines, trenches, ect.
When the move is complete lock your castors and re-set stabilisers.
Check that components have not become loose or detached during movement.
Up-date tagging procedure.When moving your tower unload your platforms.
Do not use a vehicle to either push or pull a tower.
Be careful with a high towers in windy conditions.
Check for powerlines or other obstruction.
Before movement, unlock all casters, raise stabilisers and check the route for drains, inclines, trenches, ect.
When the move is complete lock your castors and re-set stabilisers.
Check that components have not become loose or detached during movement.
Up-date tagging procedure.
14. Basic Fall Protection Mandatory
Guardrails / midrails / toe boards
Full body harnesses
Lanyards - shock absorbers / retractable
Tie off anchor points
Static lines 100% fall protection is mandatory. If for some reason 100% cannot be achieved with toe boards, midrails and handrails then full body harnesses come into play.
Harnesses must then be worn and tied off using a lanyard with a shock absorber or a retractable device. As an alloy tower is lightweight, its components will not hold from the shock of an operative falling over the side, so tie off points or static lines will need to be provided.
Never connect your lanyard to copper fittings or electrical wiring.
100% fall protection is mandatory. If for some reason 100% cannot be achieved with toe boards, midrails and handrails then full body harnesses come into play.
Harnesses must then be worn and tied off using a lanyard with a shock absorber or a retractable device. As an alloy tower is lightweight, its components will not hold from the shock of an operative falling over the side, so tie off points or static lines will need to be provided.
Never connect your lanyard to copper fittings or electrical wiring.
15. Scaffold Tagging Requirements All scaffold must be tagged
Green, yellow, red tags
Tag requirements
completion
location
Inspection sign-off There is now a tagging system in operation on Fab 14.
We have three (3) tag colours:
Green
Yellow
Red
We will explain the significance of each colour.There is now a tagging system in operation on Fab 14.
We have three (3) tag colours:
Green
Yellow
Red
We will explain the significance of each colour.
16. Tagging - Green Tag Permanent scaffold
Approval requirements
Tie off not required
Location of tag
17. Tagging - Red Tag Not safe for use
Only competent scaffold builders can access
Stay off of red tag scaffolds
18. Tagging - Yellow Tag Scaffold erectors have finished
Scaffold may not be complete
Check scaffold tag
100% tie off required
19. Inspection Requirements Competent person
Users
Document on tags Scaffolds must not be used if not first checked and tagged by a competent person.
Any prospective users should check a tower before using it.
Any prospective user is obliged to check the tag and comply with the tagging requirements before use.Scaffolds must not be used if not first checked and tagged by a competent person.
Any prospective users should check a tower before using it.
Any prospective user is obliged to check the tag and comply with the tagging requirements before use.
20. Inspections - When Prior to erection
Prior to use
After alterations
After high winds
All components must be checked for ___________ before the erection of a tower.
Towers must be checked daily prior to use and if the stability is in doubt (i.e. something fell on it or if a vehicle was in collision with it).
After high winds, platforms should be checked for movement.All components must be checked for ___________ before the erection of a tower.