An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WEST SIDE DOOR LOCATIONS (DOOR A & DOOR B) A B DOOR LOCATION PLAN (BASEMENT FLOOR PLAN) 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. MAJOR MAINTENANCE FY 15 REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-1 ADD#3: 3/18/14

  2. WEST SIDE DOORS TO BE REPLACED WITH NEW FRP DOORS. ALSO PROVIDE NEW HARDWARE AS NOTED. DOOR ‘A’ DOOR ‘B’ Draft Only WEST ELEVATION 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-2 ADD#3: 3/18/14

  3. DOOR ‘A’ – EXISTING CONDITIONS 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-3 ADD#3: 03/1814

  4. DOOR ‘B’ – EXISTING CONDITIONS 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-4 ADD#3: 03/1814

  5. Scope of Work (Reference MMFY15 Project Manual for all general project requirements) (See photo sheets for scope location clarifications) DOOR ‘A’ • Contractor shall remove and discard door leaf, hinges, closer and threshold. Salvage “Deliveries Only” sign for reinstallation. • Contractor shall salvage lockset and core – return to Owner. • Contractor shall repair lower section of rusted HM frames (both sides). Grind out all rusted and deteriorated frame areas. Refasten and anchor base pf strike side jamb to prevent future movement. Repair base of frame with Bondo or equivalent repair material. • Contractor shall install a new FRP door, threshold and associated hardware as identified. Prep existing frame to install new FRP door to replace the existing HM door. Prior to ordering door, contractor shall field measure frame opening and all hardware prep requirements. Submit shop drawings for final review and approval. Note: Hardware shall be fastened with thru-bolts as specified. • Contractor shall field measure the existing frame opening and hold the tightest dimension at the base of the frame. New door shall be sized based on using this dimension and adequate clearance shall be provided to account for the continuous hinge and operating clearance at the strike side of the jamb. • Contractor shall prep and level concrete floor to accept new threshold. Repair / replace exist interior VCT floor at threshold. Match existing VCT as required. • Prep, prime and paint interior and exterior of new FRP door. Prep, prime & paint HM frames, including exterior dividing panel between both doors. Paint shall match existing colors. • Contractor shall schedule door installation with Owner. Delivery access must be maintained at all times. • Door removal and installation of new door must occur within the same day. • Upon completion of the new door installation, ensure proper function and clearance space between new door and existing frame.. 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-5 ADD#3: 03/1814

  6. Scope of Work (Reference MMFY15 Project Manual for all general project requirements) (See photo sheets for scope location clarifications) DOOR ‘B’ • Contractor shall remove and discard door leaf, hinges and threshold. Salvage “Fire Panel” sign for reinstallation. • Contractor shall maintain and protect existing automatic door closer, electric latch and card reader system. • Contractor shall re-install activated electric latch, latch sensor and wiring. Coordinate with ISG (Integrated Security Group), Mike Veronese, 888-474-3672, and new hardware to ensure compatibility and proper installation. • Contractor shall salvage lockset and core – return to Owner. • Contractor shall repair lower section of rusted HM frames (both sides). Grind out all rusted and deteriorated frame areas. Refasten and anchor base pf strike side jamb to prevent future movement. Repair base of frame with Bondo or equivalent repair material. • Contractor shall install a new FRP door, threshold and associated hardware as identified. Prep existing frame to install new FRP door to replace the existing HM door. Prior to ordering door, contractor shall field measure frame opening and all hardware prep requirements. Note: Hardware shall be fastened with thru-bolts as specified. • Contractor shall field measure the existing frame opening and hold the tightest dimension at the base of the frame. New door shall be sized based on using this dimension and adequate clearance shall be provided to account for the continuous hinge and operating clearance at the strike side of the jamb. Submit shop drawings for review & approval. • Contractor shall prep and level concrete floor to accept new threshold. Repair / replace exist interior VCT floor at threshold. Match existing VCT as required. • Prep, prime and paint interior and exterior of new FRP door. Prep, prime & paint HM frames, including exterior dividing panel between both doors. Paint shall match existing colors. • Contractor shall schedule door installation with Owner. Egress must be maintained at all times. • Door removal and installation of new door must occur within the same day. • Upon completion of the new door installation, ensure proper function and clearance space between new door and existing frame.. 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-6 ADD#3: 03/1814

  7. Products (Reference MMFY15 Project Manual for all general project requirements) Contractor shall field measure, coordinate, furnish and install the following. Verify all field dimensions for proper ordering. DOOR ‘A’ 1. DOORS: 1 ¾” thick FRP door with insulated core (field verify existing door thickness): • Corrim - Special Lite • Commercial Door Systems; or • Approved Equal 2. HINGES: Heavy Duty Continuous MCK 25HD – 3. EXIT DEVICE: Sarg 16-8804-J-ETL704-US4-LHRB-less cylinders - TB 4. CLOSER: NOR CLP7500R – TB – 696 NOTE: Due to existing mounting holes on header stop. A steel plate (approx.) 2 ½”(w) x 8” (L) x 1/8” (d) – may be needed to cover existing holes and mount new parallel door closer. 5. THRESHOLD: PEM 2286A (or as is needed) 6. DOOR BOTTOM:PEM 345AV 7. PERIMETER WEATHERSTRIPPING: PEM Set 2892GV x 2893GV 8. CORES: (2 ea.) CorbRus 1080-114-A02-606--N25 o-bit – 9. Provide Frame Hinge Fillers 10. Provide Strike Frame Filler 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-7 ADD#3: 03/1814

  8. Products (Reference MMFY15 Project Manual for all general project requirements) Contractor shall field measure, coordinate, furnish and install the following. Verify all field dimensions for proper ordering. DOOR ‘B’ 1. DOORS: 1 ¾” thick FRP door with insulated core (field verify existing door thickness): • Corrim - Special Lite • Commercial Door Systems; or • Approved Equal 2. HINGES: Heavy Duty Continuous MCK 25HD - G 3. EXIT DEVICE: Sarg 16-8904-J-ETL704-US4-RHRB-less cylinders – TB (Field measure and prep new door to align with existing strike). 4. CLOSER: Re-install existing – provide ¼ - 20 thru bolts 5. THRESHOLD:PEM 2286A (or as is needed) 6. DOOR BOTTOM:PEM 345AV 7. PERIMETER WEATHERSTRIPPING:PEM Set 2892GV x 2893GV 8. CORES: (2 ea.) CorbRus 1080-114-A02-606--N25 o-bit- 9. Provide Hinge Frame Fillers 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-26-8 ADD#3: 03/1814