1 / 10

PHOTO. NO.

WOMEN’S ROOM. NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DATE: 01/04/13. PHOTO. NO. FISK HALL – 3 RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION PHOTOS. REVISIONS. WESLEYAN

dwoolsey
Download Presentation

PHOTO. NO.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WOMEN’S ROOM NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-1 MAJOR MAINTENANCE FY 14

  2. MEN’S ROOM DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-2 MAJOR MAINTENANCE FY 14

  3. ADA RESTROOM DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-3 MAJOR MAINTENANCE FY 14

  4. 2ND FLOOR ABOVE DROP CEILING - EXISTING CONDITIONS DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-4 MAJOR MAINTENANCE FY 14

  5. 1971 RENOVATIONS BATHROOM SPACE AFTER 1971 RENOVATION PROJECT AREA 1971 RENOVATION DRAWINGS - FOR INFORMATION AND REFERENCE ONLY. CONDITIONS IN FIELD MAY VARY. DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION DRAWINGS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-5 MAJOR MAINTENANCE FY 14

  6. BATHROOM SPACE AFTER 1971 RENOVATION BATHROOM SPACE BEFORE 1971 RENOVATION PROJECT AREA 1971 RENOVATION DRAWINGS - FOR INFORMATION AND REFERENCE ONLY. CONDITIONS IN FIELD MAY VARY. 1971 RENOVATIONS DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION DRAWINGS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-6 MAJOR MAINTENANCE FY 14

  7. PROJECT AREA - 2ND FLOOR ROOMS BELOW 3RD FLOOR BATHROOM 1991 RENOVATION DRAWINGS - FOR INFORMATION AND REFERENCE ONLY. CONDITIONS IN FIELD MAY VARY. 1991 RENOVATIONS DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION DRAWINGS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-7 MAJOR MAINTENANCE FY 14

  8. 1991 RENOVATIONS PROJECT AREA BATHROOM SPACE AFTER 1991 RENOVATION 1991 RENOVATION DRAWINGS - FOR INFORMATION AND REFERENCE ONLY. CONDITIONS IN FIELD MAY VARY. PROJECT AREA DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION DRAWINGS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-8 MAJOR MAINTENANCE FY 14

  9. PROJECT AREA BATHROOM SPACE AFTER 1991 RENOVATION 1991 RENOVATION DRAWINGS - FOR INFORMATION AND REFERENCE ONLY. CONDITIONS IN FIELD MAY VARY. PROJECT AREA 1991 RENOVATIONS DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION DRAWINGS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-9 MAJOR MAINTENANCE FY 14

  10. 2001 RENOVATIONS PREVIOUS LOUNGE SPACE CONVERTED TO ADA TOILET ROOM IN 2001 RENOVATION 2001 RENOVATION DRAWINGS - FOR INFORMATION AND REFERENCE ONLY. CONDITIONS IN FIELD MAY VARY. DATE: 01/04/13 PHOTO. NO. FISK HALL – 3RD FLOOR BATHROOM RENOVATIONS SECTION 00020 - EXISTING CONDITION DRAWINGS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-205-10 MAJOR MAINTENANCE FY 14

More Related