1 / 6

Groundwater Management Area (GMA) Process and Implementations

Groundwater Management Area (GMA) Process and Implementations. TWCA Mid-Year Conference Galveston, Texas. Gary Westbrook, General Manager Post Oak Savannah GCD. Preliminary Desired Future Conditions Groundwater Management Area 12. Primarily Based on Water Levels (WL)

bian
Download Presentation

Groundwater Management Area (GMA) Process and Implementations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Groundwater Management Area (GMA) Processand Implementations TWCA Mid-Year Conference Galveston, Texas Gary Westbrook, General Manager Post Oak Savannah GCD

  2. Preliminary Desired Future ConditionsGroundwater Management Area 12 • Primarily Based on Water Levels (WL) • Definitive and Direct Measurement of Groundwater (GW) • Reliable and consistent • WL used to calibrate GAMs • Key GW issues can be addressed through analysis of WL • Protection of Existing Users (WL compared to well screens) • Change in Aquifer Storage (change in WL x aquifer storativity) • GW-SW interaction (WL compared to bottom of stream) • Flow Direction and Amount (application of Darcy’s Law)

  3. Post Oak Savannah GCDPriorities and Concerns • Needs of well owners and land owners within GMA 12 • Improvement of Groundwater Availability Model for GMA 12 • Include more available data for calibration • Improve SW-GW interaction, Recharge, & Faults • Focus on DFCs • Define function and purpose of DFCs • Use MAG as guideline, but manage based on DFC • Provides actual evidence of impacts • Monitoring Network and Program

  4. Post Oak Savannah GCD • Website: www.posgcd.org • Regularly scheduled Board meetings on second Tuesdays of month @ District office @ 5:30 pm • Office hours Monday - Friday 8:00 am to 4:00 pm • Phone: 512-455-9900 Fax: 512-455-9909 • Email: posgcd@tconline.net

More Related