1 / 4

Rosetta Mission Data Review MIRO

Rosetta Mission Data Review MIRO. S. Milam 4/3/2012. General Comments. Inconsistency with British and American English between documents and within documents. – RID submitted. Number of typos – already RID. Need units in dataset.cat – UT for start/stop time. – RID submitted.

Download Presentation

Rosetta Mission Data Review MIRO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rosetta Mission Data ReviewMIRO S. Milam 4/3/2012

  2. General Comments • Inconsistency with British and American English between documents and within documents. – RID submitted. • Number of typos – already RID. • Need units in dataset.cat – UT for start/stop time. – RID submitted. • DSB spectrometer – no SB calibration information found. (in Inst.cat SSB performance is presented). • If SSB spectra, the rejection should also be noted and available.

  3. Few things • In CTS_LEVEL_3_FORMAT.FMT • Two columns (S0 and S1) are not defined beyond “spare”. • Same as Table 9.4-2 in User Manual? • In User’s Manual: • The channel numbers are defined for all but Band 7 & 8. It is not clear how to derive these if they are variable.

  4. Data • Using MIRO_READ_DATA: Could not get the program to compile • NASAView: can properly view all data columns, though spectra are embedded. • No access to IDL at the time of data review.

More Related