90 likes | 93 Views
This report summarizes the achievements and future plans of the PSC Study Group in the IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs).
E N D
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Closing report for the PSC Study Group] Date Submitted: July 21 2011] Source: [Myung Lee] Company [CUNY] Address [Dept of ECE, CUNY, NY, NY 10031] Voice:[212-650-7260], FAX: [Add], E-Mail:[lee@ccny.cuny.edu] Re: [.] Abstract: [San Francisco Plenary Closing Report for SG-PSC] Purpose: [] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. <Peter Murray>, <Self Consultant>
Achievements Since the withdrawal of an early core member at Singapore meeting, the Study Group effectively re-chartered with new key members. At this session, the Study group had 4 meeting slots to hear presentations on new use cases and applications. 15-11-0522-01, 15-10-0516-00, 15-11-0483-00 Group discussed main features to be supported by PSC standard Group further derived distinctive PHY and MAC features <Peter Murray>, <Self Consultant>
Achievements Group discussed the future plan for the PSC: amendment of an existing WG standard or a new task group Group felt that it needed more time to instill ideas into a new PAR and 5C Group agreed to submit a new PAR and 5C at the end of Okinawa meeting to meet the EC schedule (first week of October) Group approved the motion that WG request to extend the activity of SG PSC from the EC. <Peter Murray>, <Self Consultant>
SG PSC requests that 802.15 WG approve the extension of the Study Group PSC. Moved by: Seong-Soon Joo Seconded by: Jin-kyung Kim Yes 10 No 0 ABS 0 Study Group Motion <Peter Murray>, <Self Consultant>
SG PSC requests that 802.15 WG request approval of the extension of SG PSC from the EC. Moved by: Seong-Soon Joo Seconded by: Jin-kyung Kim Yes 10 No 0 ABS 0 Study Group Motion <Peter Murray>, <Self Consultant>
Future Plan • Weekly teleconfereincing • For initial draft of PAR and 5C before the Okinawa meeting • To review existing IEEE 802 standards to help draft solid PAR and 5C <Peter Murray>, <Self Consultant>
Call details • SG PSC Call on Tuesday August 9 at 6:30 PST, 9:30 EST, 15:30 CET, 23:30 Seoul, Tokyo • From August 17 PSC Call on Wednesdays • Three time zones will rotate (US, Asia, Europe) • Thanks to Samsung for providing teleconference facility. <Seong-Soon Joo>, <ETRI>
SG PSC requests that 802.15 WG approve the extension of the Study Group PSC. Moved by: Myung Lee Seconded by: Yes No ABS WG Motion <Peter Murray>, <Self Consultant>
SG PSC requests that 802.15 WG request approval of the extension of SG PSC from the EC. Moved by: Myung Lee Seconded by: Yes No ABS WG Motion <Peter Murray>, <Self Consultant>