DORII review Deployment and management of production infrastructure SA2. Ioannis Liabotis iliaboti@grnet.gr Greek Research and Technology Network - GRNET March 10, 2010, Stuttgart. Deliverables and Milestones.
E N D
DORII reviewDeployment and management of production infrastructureSA2 Ioannis Liabotis iliaboti@grnet.gr Greek Research and Technology Network - GRNET March 10, 2010, Stuttgart
Deliverables and Milestones • DSA2.3.a Deployment Deployment and test of selected applications on the infrastructure - Update (M18) - Done • MSA 2.3 Infrastructure for applications and instrumentation (Second Version) (M18) – Done • DSA2.4. Final description of the deployed management infrastructure (M24) – Done
TSA2.1: Analysis of Existing Resources (CNIT, GRNET) - Finished TSA2.2: Definition of the framework of the support and management infrastructure (CNIT, GRNET) - Finished TSA2.3: Implementation and management of testbeds (CNIT, GRNET, PSNC, CSIC, ELETTRA, EUCENTRE, OGS, ECOHYDROS, UC) - Ongoing TSA2.4: Finalisation of the framework of the support and management infrastructure (CNIT, GRNET) - Finished Overall schedule
Earthquake Community Instrument Resources (1/3)
Environmental Community Instrument Resources (2/3)
Experimental Science Community Demos: elettra (demo) - 3 robots, 1 robocam Instrument Resources (3/3)
Infrastructure Status – Computational and Storage Resources • Support the vo.dorii.eu catch-all VO • Other DORII Related VOs supported in various sites in Italy and Spain • Ihydra • ienvmod • gridats • lights.infn.it
vo.dorii.eu Usage – Number of Jobs Jan 2010: 232* Feb 2010: 175* Mar 2010: 106* * Not including Elettra jobs
vo.dorii.eu Usage – Elapsed CPU Time Jan 2010: 68h* Feb 2010: 262h* * Not including Elettra jobs
Network Traffic Showing Files Transfers Traffic between OGS and HellasGrid Traffic between Elettra and HellasGrid Traffic between Eucentre and HellasGrid
Resource Availability • Computational and Storage resources availability ~ 90% • IE Resources availability:
Future Plans • Continue the infrastructure operations and provide services to DORII users • Short Term • Deploy Secondary Services (long standing action) • Generate accounting data for IE • IE Maintainers have to keep log files even when installing new versions of IE • If we want accounting per application we need to get the user DNs for each application • Resolve MPI issues • Register DORII VO to CIC portal • Decide if GPU resources are needed
Integration with Network Resource Provisioning • Collaborate closely with SA1 to identify network related problems • IPv6 issues? • SNMP issues?
Thank you! • Questions?