DORII review Deployment and management of production infrastructure SA2

DORII review Deployment and management of production infrastructure SA2. Ioannis Liabotis iliaboti@grnet.gr Greek Research and Technology Network - GRNET March 10, 2010, Stuttgart. Deliverables and Milestones.

blaise
Download Presentation

DORII review Deployment and management of production infrastructure SA2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DORII reviewDeployment and management of production infrastructureSA2 Ioannis Liabotis iliaboti@grnet.gr Greek Research and Technology Network - GRNET March 10, 2010, Stuttgart

  2. Deliverables and Milestones • DSA2.3.a Deployment Deployment and test of selected applications on the infrastructure - Update (M18) - Done • MSA 2.3 Infrastructure for applications and instrumentation (Second Version) (M18) – Done • DSA2.4. Final description of the deployed management infrastructure (M24) – Done

  3. TSA2.1: Analysis of Existing Resources (CNIT, GRNET) - Finished TSA2.2: Definition of the framework of the support and management infrastructure (CNIT, GRNET) - Finished TSA2.3: Implementation and management of testbeds (CNIT, GRNET, PSNC, CSIC, ELETTRA, EUCENTRE, OGS, ECOHYDROS, UC) - Ongoing TSA2.4: Finalisation of the framework of the support and management infrastructure (CNIT, GRNET) - Finished Overall schedule

  4. Earthquake Community Instrument Resources (1/3)

  5. Environmental Community Instrument Resources (2/3)

  6. Experimental Science Community Demos: elettra (demo) - 3 robots, 1 robocam Instrument Resources (3/3)

  7. Infrastructure Status – Computational and Storage Resources • Support the vo.dorii.eu catch-all VO • Other DORII Related VOs supported in various sites in Italy and Spain • Ihydra • ienvmod • gridats • lights.infn.it

  8. Core Services

  9. vo.dorii.eu Members (at M24)

  10. vo.dorii.eu Usage – Number of Jobs Jan 2010: 232* Feb 2010: 175* Mar 2010: 106* * Not including Elettra jobs

  11. vo.dorii.eu Usage – Elapsed CPU Time Jan 2010: 68h* Feb 2010: 262h* * Not including Elettra jobs

  12. IE Accounting

  13. Network Traffic Showing Files Transfers Traffic between OGS and HellasGrid Traffic between Elettra and HellasGrid Traffic between Eucentre and HellasGrid

  14. Resource Availability • Computational and Storage resources availability ~ 90% • IE Resources availability:

  15. Future Plans • Continue the infrastructure operations and provide services to DORII users • Short Term • Deploy Secondary Services (long standing action) • Generate accounting data for IE • IE Maintainers have to keep log files even when installing new versions of IE • If we want accounting per application we need to get the user DNs for each application • Resolve MPI issues • Register DORII VO to CIC portal • Decide if GPU resources are needed

  16. Integration with Network Resource Provisioning • Collaborate closely with SA1 to identify network related problems • IPv6 issues? • SNMP issues?

  17. Thank you! • Questions?